Visualization investigation of the large deformation and instability failure of shield tunnel using transparent soil models

被引:1
|
作者
Wang, Manling [1 ,2 ]
Li, Shuchen [2 ,3 ]
Zhou, Huiying [1 ,2 ]
Peng, Kefeng [1 ,2 ]
Yuan, Chao [2 ,3 ]
机构
[1] Shandong Univ, Sch Qilu Transportat, Jinan 250002, Shandong, Peoples R China
[2] Shandong Univ, Inst Geotech & Underground Engn, Jinan 250061, Shandong, Peoples R China
[3] Shandong Univ, Sch Future Technol, Jinan 250002, Shandong, Peoples R China
基金
中国国家自然科学基金;
关键词
Shield tunnel; Transparent soil; Large deformation; Failure mechanism; Support pressure; Surface settlement; FACE STABILITY ANALYSIS; GEOTECHNICAL PROPERTIES; CENTRIFUGE; SAND; SILICA; DRIVEN;
D O I
10.1016/j.engfailanal.2024.108861
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Reliable prediction of the large deformation and instability failure caused by shield tunnels is critical for minimizing the adverse effects that may occur during tunnel excavation. A transparent soil surrogate representing the geotechnical behavior of sand was used to investigate spatial soil deformations within the soil mass. The support pressure, soil displacement, surface settlement, and failure mechanism were captured to explore the instability and failure of the shield tunnel for six cover-to-diameter (C/D) ratios ranging from 0.5 to 3.0. The support pressure undergoes three stages: rapid decrease, minor rebound, and stabilization. The soil mass ahead of the excavation face goes through three distinct stages: an elastic-plastic state, local instability failure, and ultimate overall instability failure. The failure mechanism is identified as a logarithmic spiral failure mode in front of the tunnel face and an ellipsoid failure mode above the tunnel face. The maximum surface settlement in the longitudinal section of the tunnel occurs at a distance of 0.2D to 0.3D ahead of the excavation face, while the maximum surface settlement in the cross-section is observed at the tunnel axis. The surface settlement can be divided into three stages: no settlement, slow settlement, and accelerated settlement. Considering the lag in surface settlement relative to excavation face displacement, it is critical in practical engineering to monitor the rate of surface settlement growth and control it within the no settlement or slow settlement stages to guarantee construction safety.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] Investigation of the Deformation Characteristics and Bearing Capacity of a Segment Structure of a Shield Tunnel with Cracks
    Chuankun Liu
    Shimin Wang
    Wenqi Guo
    Fan Chen
    Junbo Zhang
    Chuan He
    KSCE Journal of Civil Engineering, 2022, 26 : 381 - 393
  • [32] Failure criterion and deformation instability evaluation analysis of a tunnel by nonlinear dynamics
    Liu Zhen
    Zhou Cui-ying
    Fang Ming
    ROCK AND SOIL MECHANICS, 2010, 31 (12) : 3887 - 3893
  • [33] Research on failure criterion and energy evolution model of tunnel deformation instability
    Liu, Zhen
    Zhou, Cui-Ying
    Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (SUPPL. 2): : 131 - 137
  • [34] Research on failure criterion and energy evolution model of tunnel deformation instability
    Liu Zhen
    Zhou Cui-ying
    ROCK AND SOIL MECHANICS, 2010, 31 : 131 - 137
  • [35] Numerical study on transverse deformation characteristics of shield tunnel subject to local soil loosening
    Su, Dong
    Chen, Weijie
    Wang, Xuetao
    Huang, Maolong
    Pang, Xiaochao
    Chen, Xiangsheng
    UNDERGROUND SPACE, 2022, 7 (01) : 106 - 121
  • [36] Influence of lateral pressure loss on the force and deformation of shield tunnel in soft soil area
    Liang D.
    Jin H.
    Xiao J.-H.
    Zhou S.-H.
    Gongcheng Lixue/Engineering Mechanics, 2019, 36 (05): : 148 - 156and175
  • [37] Study on soil deformation caused by overlapping shield tunnel construction based on uniform solution
    Wei G.
    Zhao D.
    Xu H.
    Zhou Y.
    Chen C.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2022, 53 (02): : 589 - 598
  • [38] Model Test Study on Deformation and Failure of Metro Shield Tunnel under Normal Faulting
    Li, Hanyuan
    Li, Xinggao
    Wang, Jie
    Yang, Yi
    Liu, Hao
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2024, 51 (05): : 76 - 87
  • [39] Large deformation induced soil pressure changes in a loess tunnel
    Du, Xuchao
    Li, Yao
    Dong, Xing
    Han, Kuan
    ENGINEERING FAILURE ANALYSIS, 2024, 163
  • [40] Instability process and characteristics of the excavation face of shield tunnels using transparent clays
    Lei H.
    Liu M.
    Cheng Z.
    Zhong H.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2022, 41 (06): : 1235 - 1245