Visualization investigation of the large deformation and instability failure of shield tunnel using transparent soil models

被引:1
|
作者
Wang, Manling [1 ,2 ]
Li, Shuchen [2 ,3 ]
Zhou, Huiying [1 ,2 ]
Peng, Kefeng [1 ,2 ]
Yuan, Chao [2 ,3 ]
机构
[1] Shandong Univ, Sch Qilu Transportat, Jinan 250002, Shandong, Peoples R China
[2] Shandong Univ, Inst Geotech & Underground Engn, Jinan 250061, Shandong, Peoples R China
[3] Shandong Univ, Sch Future Technol, Jinan 250002, Shandong, Peoples R China
基金
中国国家自然科学基金;
关键词
Shield tunnel; Transparent soil; Large deformation; Failure mechanism; Support pressure; Surface settlement; FACE STABILITY ANALYSIS; GEOTECHNICAL PROPERTIES; CENTRIFUGE; SAND; SILICA; DRIVEN;
D O I
10.1016/j.engfailanal.2024.108861
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Reliable prediction of the large deformation and instability failure caused by shield tunnels is critical for minimizing the adverse effects that may occur during tunnel excavation. A transparent soil surrogate representing the geotechnical behavior of sand was used to investigate spatial soil deformations within the soil mass. The support pressure, soil displacement, surface settlement, and failure mechanism were captured to explore the instability and failure of the shield tunnel for six cover-to-diameter (C/D) ratios ranging from 0.5 to 3.0. The support pressure undergoes three stages: rapid decrease, minor rebound, and stabilization. The soil mass ahead of the excavation face goes through three distinct stages: an elastic-plastic state, local instability failure, and ultimate overall instability failure. The failure mechanism is identified as a logarithmic spiral failure mode in front of the tunnel face and an ellipsoid failure mode above the tunnel face. The maximum surface settlement in the longitudinal section of the tunnel occurs at a distance of 0.2D to 0.3D ahead of the excavation face, while the maximum surface settlement in the cross-section is observed at the tunnel axis. The surface settlement can be divided into three stages: no settlement, slow settlement, and accelerated settlement. Considering the lag in surface settlement relative to excavation face displacement, it is critical in practical engineering to monitor the rate of surface settlement growth and control it within the no settlement or slow settlement stages to guarantee construction safety.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Experimental investigation on backfill grouting deformation characteristics of shield tunnel in sand
    Han, Yue-Wang
    Zhu, Wei
    Zhong, Xiao-Chun
    Jia, Rui
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 303 - 306
  • [22] Deformation control criterion of shield tunnel under lateral relaxation of soft soil
    Shimin Wang
    Xiaoyu Peng
    Hang Zhou
    Xuhu He
    Anqi Zhou
    Bing Chen
    Frontiers of Structural and Civil Engineering, 2023, 17 : 780 - 795
  • [23] Application Analysis on Convergence Deformation of Soft Soil Shield Tunnel Controlled by Grouting
    Wang, Tingbo
    Zhou, Qun
    Guo, Chunsheng
    Yang, Shifei
    Lei, Dan
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 324 - 332
  • [24] Deformation control criterion of shield tunnel under lateral relaxation of soft soil
    Shimin WANG
    Xiaoyu PENG
    Hang ZHOU
    Xuhu HE
    Anqi ZHOU
    Bing CHEN
    Frontiers of Structural and Civil Engineering, 2023, 17 (05) : 780 - 795
  • [25] Deformation control criterion of shield tunnel under lateral relaxation of soft soil
    Wang, Shimin
    Peng, Xiaoyu
    Zhou, Hang
    He, Xuhu
    Zhou, Anqi
    Chen, Bing
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2023, 17 (05) : 780 - 795
  • [26] Deformation and failure mechanism of metro shield tunnel subjected to buried fault dislocation
    Li, Hanyuan
    Li, Xinggao
    Liu, Hao
    ENGINEERING FAILURE ANALYSIS, 2023, 153
  • [27] Spatial Deformation Measurement Using Transparent Soil
    Iskander, Magued
    Liu, Jinyuan
    GEOTECHNICAL TESTING JOURNAL, 2010, 33 (04): : 314 - 321
  • [28] A variational method for calculating the longitudinal deformation of a shield tunnel in soft soil caused by grouting under tunnel
    Di, Honggui
    Huang, Shihao
    Fu, Longlong
    Wang, Binglong
    ENGINEERING COMPUTATIONS, 2021, 38 (06) : 2733 - 2754
  • [29] Limit equilibrium models for passive failure of a large-diameter shield tunnel face in reinforced soft clay
    Song, Qilong
    Su, Dong
    Pan, Qiujing
    Han, Wenlong
    Chen, Xiangsheng
    ACTA GEOTECHNICA, 2024, 19 (08) : 5231 - 5247
  • [30] Investigation of the Deformation Characteristics and Bearing Capacity of a Segment Structure of a Shield Tunnel with Cracks
    Liu, Chuankun
    Wang, Shimin
    Guo, Wenqi
    Chen, Fan
    Zhang, Junbo
    He, Chuan
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (01) : 381 - 393