Risk-Based Prioritization Method for Rescheduling Delayed Preventive Maintenance of Electric Power Transmission Assets
被引:0
|
作者:
Shaulagara, Shaga
论文数: 0引用数: 0
h-index: 0
机构:
Engineering Upt Durikosambi, Pt Pln (PERSERO) Uitjbb, Jakarta, IndonesiaEngineering Upt Durikosambi, Pt Pln (PERSERO) Uitjbb, Jakarta, Indonesia
Shaulagara, Shaga
[1
]
Fazlurrahman, Verly
论文数: 0引用数: 0
h-index: 0
机构:
Engineering Upt Durikosambi, Pt Pln (PERSERO) Uitjbb, Jakarta, IndonesiaEngineering Upt Durikosambi, Pt Pln (PERSERO) Uitjbb, Jakarta, Indonesia
Fazlurrahman, Verly
[1
]
Riyandhini, Hening Putri
论文数: 0引用数: 0
h-index: 0
机构:
Engineering Upt Durikosambi, Pt Pln (PERSERO) Uitjbb, Jakarta, IndonesiaEngineering Upt Durikosambi, Pt Pln (PERSERO) Uitjbb, Jakarta, Indonesia
Riyandhini, Hening Putri
[1
]
机构:
[1] Engineering Upt Durikosambi, Pt Pln (PERSERO) Uitjbb, Jakarta, Indonesia
来源:
Proceedings of 2023 4th International Conference on High Voltage Engineering and Power Systems, ICHVEPS 2023
|
2023年
关键词:
Compilation and indexing terms;
Copyright 2024 Elsevier Inc;
D O I:
4th International Conference on High Voltage Engineering and Power Systems, ICHVEPS 2023
中图分类号:
学科分类号:
摘要:
Condition based maintenance - Decision making - Electric power transmission - Electric power transmission networks - Electric substations - Risk assessment - Transmissions