Shutdowns of 220 kV and 400 kV power transmission lines caused by winter lightning strikes in Poland in January 2022

被引:0
作者
Lenarczyk, Krzysztof [1 ]
Loboda, Marek [2 ]
机构
[1] Polish Transmission System Operator (PSE), Technical Standards Department, Konstancin-Jeziorna, Poland
[2] Warsaw University of Technology, Faculty of Electrical Engineering, Warsaw, Poland
来源
ICLP 2022 - 36th International Conference on Lightning Protection | 2022年
关键词
Compendex;
D O I
36th International Conference on Lightning Protection, ICLP 2022
中图分类号
学科分类号
摘要
Electric lines
引用
收藏
页码:20 / 25
相关论文
empty
未找到相关数据