2020 CURRENT PROCESS BENCHMARK FOR THE LAST PLANNER® SYSTEM OF PROJECT PLANNING AND CONTROL

被引:0
|
作者
Ballard, Glenn [1 ]
Tommelein, Iris [1 ]
机构
[1] Project Production Systems Laboratory, University of California, Berkeley, United States
来源
Lean Construction Journal | 2021年 / 2021卷
关键词
D O I
暂无
中图分类号
学科分类号
摘要
98
引用
收藏
页码:53 / 121
相关论文
共 50 条
  • [31] This has been a real uphill battle - three organisations for the adoption of Last Planner System (vol 47, pg 109, 2020)
    Maki, Tarja
    Kerosuo, Hannele
    Koskenvesa, Anssi
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2021, 48 (06) : 729 - 729
  • [32] Research on Access Control in Collaborative Process Planning System
    Su, Yingying
    Wang, Jianrong
    Liang, Shuang
    Tang, Liang
    Wang, Wanshan
    2008 INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION, VOL I, PROCEEDINGS, 2008, : 726 - 730
  • [33] Planning an integrated process control system for glass manufacture
    Marshall, Richard W.
    Glass international, 1988,
  • [34] Comparative Analysis of Planning with the Critical Path Method, Last Planner System, and Location-Based Techniques in Brazil, Finland, and the United States
    Scala, Natalie M.
    Schiavone, Vincent
    Olivieri, Hylton
    Seppanen, Olli
    Alves, Thais da C. L.
    Liu, Min
    Granja, Ariovaldo Denis
    ENGINEERING MANAGEMENT JOURNAL, 2023, 35 (03) : 237 - 256
  • [35] AN EXPERT SYSTEM APPROACH IN PROCESS PLANNING - CURRENT DEVELOPMENT AND ITS FUTURE
    GUPTA, T
    COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 18 (01) : 69 - 80
  • [36] Virtual simulation environment for comparing and testing current modeling strategies in project planning and control
    Ead, Rana
    Abourizk, Simaan
    AUTOMATION IN CONSTRUCTION, 2024, 166
  • [37] A Context-Driven Model for the Flat Roofs Construction Process through Sensing Systems, Internet-of-Things and Last Planner System
    Dolores Andujar-Montoya, Maria
    Marcos-Jorquera, Diego
    Manuel Garcia-Botella, Francisco
    Gilart-Iglesias, Virgilio
    SENSORS, 2017, 17 (07)
  • [38] Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System
    Silveira, Bruno Falcon
    Costa, Dayana Bastos
    CONSTRUCTION INNOVATION-ENGLAND, 2024, 24 (04): : 1005 - 1025
  • [39] PROJECT-RELATED EDP SYSTEM FOR INTEGRATED PLANNING AND CONTROL OF SCHEDULES AND COSTS
    KOMARNICKI, J
    TECHNISCHE MITTEILUNGEN KRUPP FORSCHUNGSBERICHTE, 1973, 31 (01): : 25 - 38
  • [40] Comparing Point-to-point Precedence Relations and Location-Based Management System in Last Planner System: A housing project of highly repetitive processes case study
    Brioso, Xavier
    Humero, Antonio
    Calampa, Sarah
    5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 12 - 19