Operational Influence Line Identification of High-Speed Railway Bridge Considering Uncertainty of Train Load

被引:3
|
作者
Zheng, Han-Wen [1 ]
Yi, Ting-Hua [1 ]
Zheng, Xu [1 ]
Wei, Yun-Tao [1 ]
Li, Hong-Nan [1 ]
机构
[1] Dalian Univ Technol, Sch Civil Engn, Dalian 116023, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Structural health monitoring; High-speed railway bridge; Influence line identification; Bridge operational phase; Binary classification; INTERVAL-ANALYSIS; DYNAMIC-ANALYSIS; SYSTEM;
D O I
10.1061/AJRUA6.RUENG-1247
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The bridge influence line (BIL) contains static information for each section of a bridge, which is an important tool for bridge design and condition evaluation. The current influence line identification procedure relies on periodic load testing using calibrated vehicles and always leads to long-time traffic disruption. To overcome this shortcoming and achieve online tracking of high-speed railway (HSR) bridge influence lines, this paper proposes an operational influence line identification approach for HSR bridges based on train-induced responses only. First, to consider the train load uncertainty during operation, a train load interval model is established based on field investigations. Then, the BIL intervals are determined by interval computations and accumulate to generate a continuously updated database. Finally, the influence line is identified from the BIL interval database using a binary classification algorithm. The proposed method is verified by an example of a three-span girder bridge, and a train-bridge interaction model is established to simulate the bridge responses induced by various train loads. The results show that the proposed approach has similar accuracy as the traditional load testing methods, which can achieve high-accuracy online tracking of HSR bridge influence lines.
引用
收藏
页数:14
相关论文
共 50 条
  • [32] Transfer Functions of Bridge and Train: Case Study of the Yunjung Bridge in Honam High-Speed Railway System
    Yoo, Mintaek
    Yang, Seunghoon
    Moon, Jae Sang
    Kwak, Dongyoup
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (10) : 4253 - 4264
  • [33] Transfer Functions of Bridge and Train: Case Study of the Yunjung Bridge in Honam High-Speed Railway System
    Mintaek Yoo
    Seunghoon Yang
    Jae Sang Moon
    Dongyoup Kwak
    KSCE Journal of Civil Engineering, 2022, 26 : 4253 - 4264
  • [34] Train-bridge interaction effects on the dynamic response of a small span high-speed railway bridge
    Rocha, J.
    Henriques, A. A.
    Calcada, R.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 1718 - 1725
  • [35] System identification of a high-speed railway bridge with consideration of bridge-soil interaction
    Huang, MC
    Chen, CH
    Chen, TC
    Environmental Vibrations: Prediction, Monitoring, Mitigation and Evaluation (ISEV 2005), 2005, : 249 - 254
  • [36] Train-bridge interaction - Validation of numerical models by experiments on a high-speed railway bridge in antoing
    De Roeck, G
    Maeck, J
    Teughels, A
    TIVC'2001: INTERNATIONAL SYMPOSIUM ON TRAFIC INDUCED VIBRATIONS & CONTROLS, 2001, : 283 - 294
  • [37] Off-Line Hybrid Simulation Method on Train-Track-Bridge Coupling Vibration in High-Speed Railway
    Guo, Wei
    Long, Yan
    He, Chang
    Wang, Yang
    Zeng, Yongping
    Song, Jianping
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2022, 22 (10)
  • [38] Evaluation of Dynamic Load Factors for a High-Speed Railway Truss Arch Bridge
    Ding Youliang
    Wang Gaoxin
    SHOCK AND VIBRATION, 2016, 2016
  • [39] Design of a High-Speed Railway Passenger Train Operation Scheme considering Survivability of the Network
    Xian, Yong
    Li, Yinzhen
    Li, Haijun
    Ma, Changxi
    Zhang, Tianxiang
    Zhao, Yongpeng
    JOURNAL OF ADVANCED TRANSPORTATION, 2023, 2023
  • [40] Study on the Train Timetable Rescheduling of High-speed Railway Considering the Satisfaction of Transfer Passengers
    Dong, Aoran
    Liu, Bin
    Tian, Zhiqiang
    Deng, Zhiwen
    ENGINEERING LETTERS, 2024, 32 (06) : 1169 - 1181