Operational Influence Line Identification of High-Speed Railway Bridge Considering Uncertainty of Train Load

被引:3
|
作者
Zheng, Han-Wen [1 ]
Yi, Ting-Hua [1 ]
Zheng, Xu [1 ]
Wei, Yun-Tao [1 ]
Li, Hong-Nan [1 ]
机构
[1] Dalian Univ Technol, Sch Civil Engn, Dalian 116023, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Structural health monitoring; High-speed railway bridge; Influence line identification; Bridge operational phase; Binary classification; INTERVAL-ANALYSIS; DYNAMIC-ANALYSIS; SYSTEM;
D O I
10.1061/AJRUA6.RUENG-1247
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The bridge influence line (BIL) contains static information for each section of a bridge, which is an important tool for bridge design and condition evaluation. The current influence line identification procedure relies on periodic load testing using calibrated vehicles and always leads to long-time traffic disruption. To overcome this shortcoming and achieve online tracking of high-speed railway (HSR) bridge influence lines, this paper proposes an operational influence line identification approach for HSR bridges based on train-induced responses only. First, to consider the train load uncertainty during operation, a train load interval model is established based on field investigations. Then, the BIL intervals are determined by interval computations and accumulate to generate a continuously updated database. Finally, the influence line is identified from the BIL interval database using a binary classification algorithm. The proposed method is verified by an example of a three-span girder bridge, and a train-bridge interaction model is established to simulate the bridge responses induced by various train loads. The results show that the proposed approach has similar accuracy as the traditional load testing methods, which can achieve high-accuracy online tracking of HSR bridge influence lines.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Running Safety of High-Speed Railway Train on Bridge During Earthquake Considering Uncertainty Parameters of Bridge
    Liu, Xiang
    Jiang, Lizhong
    Xiang, Ping
    Feng, Yulin
    Lai, Zhipeng
    Zhou, Wen
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2022, 22 (10)
  • [2] A Train Rescheduling Optimization model with considering the Train Control for A High-Speed Railway Line under Temporary Speed Restriction
    Long, Sihui
    Meng, Lingyun
    Wang, Yihui
    Miao, Jianrui
    Li, Tinglan
    Corman, Francesco
    2019 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE (ITSC), 2019, : 2809 - 2816
  • [3] Temporal Impact of High-Speed Railway Traction Load on Grid Voltage Considering the Uncertainty
    Che, Yulong
    Chen, Xiaojing
    Lin, Hongjian
    Gao, Yuan
    Lyu, Xiaoqin
    Chen, Yuanxi
    IEEE TRANSACTIONS ON TRANSPORTATION ELECTRIFICATION, 2024, 10 (04): : 9381 - 9395
  • [4] The influence of construction residual stress and sextuple-line train load on the high-speed railway frame structure
    Zhang, Moyan
    Xiao, Hong
    Wang, Jiaqi
    Nadakatti, Mahantesh M.
    Wang, Yang
    Chen, Peng
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 324
  • [5] The influence of construction residual stress and sextuple-line train load on the high-speed railway frame structure
    Zhang M.
    Xiao H.
    Wang J.
    Nadakatti M.M.
    Wang Y.
    Chen P.
    Construction and Building Materials, 2022, 324
  • [6] The Security Study of Train Derailment on High-Speed Railway Bridge
    Lin, Yusen
    Xin, Li Hua
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1144 - 1147
  • [7] Estimation of the vibration serviceability deflection limit of a high-speed railway bridge considering the bridge-train interaction and travel speed
    Bub-Gyu Jeon
    Nam-Sik Kim
    Sung-Il Kim
    KSCE Journal of Civil Engineering, 2016, 20 : 747 - 761
  • [8] Estimation of the Vibration Serviceability Deflection Limit of a High-speed Railway Bridge Considering the Bridge-Train Interaction and Travel Speed
    Jeon, Bub-Gyu
    Kim, Nam-Sik
    Kim, Sung-Il
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (02) : 747 - 761
  • [9] A transmission network planning method considering high-speed railway load andwind and solar uncertainty
    Gou J.
    Liu F.
    Liu J.
    Sun W.
    Zhang Q.
    Liu Z.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2023, 51 (09): : 156 - 164
  • [10] Load Identification Method for High-speed Train Gearbox
    Hu W.
    Liu Z.
    Li Q.
    Liu W.
    Tiedao Xuebao/Journal of the China Railway Society, 2020, 42 (12): : 50 - 57