BIM implementation in project management practices for sustainable development: Partial Least square approach

被引:3
作者
Sajjad, Muhammad [1 ]
Hu, Anfeng [1 ]
Radu, Dorin [2 ]
Waqar, Ahsan [3 ]
Almujibah, Hamad R. [4 ]
Mateen, Abdul [5 ]
机构
[1] Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou 310058, Peoples R China
[2] Transylvania Univ Brasov, Fac Civil Engn, Turnului 5, Braov 500152, Romania
[3] Univ Lahore, Gujrat Campus,Jalalpur Jattan Rd, Gujrat 50700, Punjab, Pakistan
[4] Taif Univ, Coll Engn, Dept Civil Engn, Box 11099, Taif 21944, Saudi Arabia
[5] Int Islamic Univ, Dept Civil Engn, Islamabad 44000, Pakistan
关键词
BIM implementation; Project management; Pakistani construction industry; Success factors; INFORMATION MODELING BIM; BUILDINGS;
D O I
10.1016/j.asej.2024.103048
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As an emerging area with far-reaching implications for project management practices, Despite the growing global adoption of Building Information Modelling (BIM), its implementation in the Pakistani construction sector faces significant challenges, particularly in relation to conflict and risk management, communication, and technical safety practices. The primary objective of this study is to identify and evaluate the key factors influencing BIM adoption in Pakistan, with a specific focus on understanding the roles of conflict and risk management, communication, technical safety management, and resource management in successful BIM implementation. The research used a combined pilot survey with 90 contributors, a prime questionnaire with 125 contributors, an exploratory factor analysis (EFA), and a structural equation modelling (SEM) approach has been used to do in depth statistical analysis. The results indicated the highest relation among planning and technical safety management and BIM implementation with path impact value of 0.613 followed by conflict and risk management with path value 272. According to the findings, every contributes appreciably to BIM's usefulness in construction and project management. This examination contributes to the development of BIM research.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] System-Level Critical Success Factors for BIM Implementation in Construction Management: An AHP Approach
    Ottaviani, Filippo Maria
    Zenezini, Giovanni
    Saba, Francesca
    De Marco, Alberto
    Gavinelli, Lorenzo
    SYSTEMS, 2025, 13 (02):
  • [42] Implementation of Project Management in Eco-Industrial Parks Development in Russian Cities
    Liubarskaia, M. A.
    Tsurkan, M. V.
    Vorotnikov, A. M.
    INTERNATIONAL CONFERENCE ON SUSTAINABLE CITIES, 2018, 2018, 177
  • [43] Application of integrated fuzzy FCM-BIM-IoT for sustainable material selection and energy management of metro rail station box project in western India
    Bapat, Hirakraj
    Sarkar, Debasis
    Gujar, Rajesh
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2021, 6 (02)
  • [44] Sustainable project management in urban development projects: a case study of the Greater Port Harcourt City Development Project in Rivers State, Nigeria
    Jack, M. W.
    Coles, A. M.
    Piterou, A.
    SUSTAINABLE DEVELOPMENT AND PLANNING VIII, 2017, 210 : 209 - 219
  • [45] A knowledge management framework for global project development based on Tai Chi principles and practices
    Swain, Deborah Elizabeth
    Lightfoot, James Earl
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2016, 9 (03) : 624 - 653
  • [46] Sustainable Development Planning: Master's Based on a Project-Based Learning Approach
    Cazorla-Montero, Adolfo
    de los Rios-Carmenado, Ignacio
    Pasten, Juan Ignacio
    SUSTAINABILITY, 2019, 11 (22)
  • [47] Development of a suitable project management approach for projects with parallel planning and execution
    Freitas, F.
    Silva, F. J. G.
    Campilho, R. D. S. G.
    Pimentel, C.
    Godina, R.
    30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1544 - 1550
  • [48] Adopting best practices - "Agility" moves from software development to healthcare project management
    Kitzmiller, R
    Hunt, E
    Sproat, SB
    CIN-COMPUTERS INFORMATICS NURSING, 2006, 24 (02) : 75 - 82
  • [49] Radio frequency identification implementation model for sustainable development: A structural equation modeling approach
    Oke, Ayodeji Emmanuel
    Kineber, Ahmed Farouk
    Elseknidy, Mohamed
    Kayode, Fakunle Samuel
    SUSTAINABLE DEVELOPMENT, 2023, 31 (03) : 1824 - 1844
  • [50] Features of Development of Russian Garbage Treatment Clusters through the Implementation of Methods of Project Management
    Koryakov, Alexey G.
    Zhemerikin, Oleg, I
    Kulikov, Mikhail, V
    EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT THROUGH VISION 2020, 2019, : 1297 - 1305