An investigation of mixed-model assembly line balancing problem with uncertain assembly time in remanufacturing

被引:2
作者
Liu, Qingtao [1 ]
Wei, Xinji [1 ]
Wang, Qi [1 ]
Song, Jiayao [2 ]
Lv, Jingxiang [1 ]
Liu, Ying [3 ]
Tang, Ou [4 ]
机构
[1] Changan Univ, Key Lab Rd Construct Technol & Equipment, MOE, Xian 710064, Peoples R China
[2] BYD Co Ltd, Prod Planning & New Auto Technol Res Inst, Shenzhen 518118, Peoples R China
[3] Cardiff Univ, Sch Engn, Dept Mech Engn, Cardiff CF24 3AA, Wales
[4] Linkoping Univ, Dept Management & Engn, Div Prod Econ, SE-58183 Linkoping, Sweden
基金
中国国家自然科学基金;
关键词
Mixed-model assembly; Assembly line balancing; FGERT; Multi-objective optimization; Genetic algorithm; QUALITY-CONTROL METHOD; COMPONENTS;
D O I
10.1016/j.cie.2024.110676
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In recent decades, remanufacturing has emerged as an effective way to address resource crises and environmental pollution issues. Unlike traditional manufacturing, remanufacturing production is filled with various variable factors, especially in the assembly phase. Due to changes in part types, quality conditions, and assembly methods, the assembly time becomes highly uncertain. Assembly line balancing is a key challenge to achieve the stable operation of remanufacturing system. This study proposes an evaluation method for remanufacturing assembly time and establishes a multi-objective mathematical model for balancing remanufacturing mixed- model assembly (RMMA) line. The evaluation method utilizes the Fuzzy Graphical Evaluation Review Technique (FGERT) network to predict expected assembly time for each operation. The balancing model aims to optimize remanufacturing takt time and comprehensive balance rate (CBR). To effectively solve this model, an adaptive double-layer genetic algorithm (ADGA) is designed, where layer I ensures production efficiency and layer II optimizes assembly line balance. Finally, an assemble example of high-pressure common rail fuel pumps (HCRFP) is used to validate the effectiveness of the proposed method. The results demonstrate notable improvements compared to traditional single-product assembly (TSPA) line in scenarios with workstation numbers 4, 5, 6, and 7. Specifically, the production takt time is reduced by 4.19% to 9.56%, and CBR is enhanced by approximately 50%. Further comparison with three other classic algorithms confirms the superiority of ADGA. Additionally, it is observed that remanufacturability (proportion of remanufactured parts) has a significant impact on assembly performance. As remanufacturability increases, both takt time and CBR increase, reaching their maximum values when remanufacturability is around 0.5.
引用
收藏
页数:18
相关论文
共 52 条
[1]  
Al-e-hashem S., 2009, Mixed Model Assembly Line Balancing Problem under Uncertainty, P233
[2]   Hybridizations in line balancing problems: A comprehensive review on new trends and formulations [J].
Battaia, Olga ;
Dolgui, Alexandre .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2022, 250
[3]   A taxonomy of line balancing problems and their solution approaches [J].
Battaia, Olga ;
Dolgui, Alexandre .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 142 (02) :259-277
[4]  
Bautista J., 2016, Minimizing Lost-Work Costs in a Mixed-Model Assembly Line, P213
[5]   A classification of assembly line balancing problems [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (02) :674-693
[6]   Assembly line balancing: What happened in the last fifteen years? [J].
Boysen, Nils ;
Schulze, Philipp ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 301 (03) :797-814
[7]   Multiperiod Remanufacturing Planning With Uncertain Quality of Inputs [J].
Denizel, Meltem ;
Ferguson, Mark ;
Souza, Gilvan 'Gil' C. .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2010, 57 (03) :394-404
[8]   Balancing assembly lines with industrial and collaborative robots: Current trends and future research directions [J].
Fathi, Masood ;
Sepehri, Arash ;
Ghobakhloo, Morteza ;
Iranmanesh, Mohammad ;
Tseng, Ming-Lang .
COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 193
[9]   Optimal Acquisition Quantities in Remanufacturing with Condition Uncertainty [J].
Galbreth, Michael R. ;
Blackburn, Joseph D. .
PRODUCTION AND OPERATIONS MANAGEMENT, 2010, 19 (01) :61-69
[10]   Remanufacturing-oriented process planning and scheduling: mathematical modelling and evolutionary optimisation [J].
Gong, Guiliang ;
Deng, Qianwang ;
Chiong, Raymond ;
Gong, Xuran ;
Huang, Hezhiyuan ;
Han, Wenwu .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (12) :3781-3799