共 126 条
- [71] LIU Fei-xiang, Prospects for intelligent construction equipment technology innovation and collaborative construction management of railway tunnel [J], Tunnel Construction, 39, 4, pp. 545-555, (2019)
- [72] ZHANG Shou-tong, Application technology of fully computerized three-arm jumbo drill in tunneling mechanization construction [J], Modern Urban Transit, 1, pp. 58-62, (2022)
- [73] PANG Ming-hai, Application and fault analysis of Boltec235 bolt trolley [J], China Resources Comprehensive Utilization, 36, 8, pp. 168-171, (2018)
- [74] LIU Chang-wu, LU ShiTiang, Effect of bolting-grouting reinforcement on integrity and quasi-strength of rock mass [J], Journal of China University of Mining &- Technology, 28, 3, pp. 221-224, (1999)
- [75] LI Hao-nan, FU Da-yu, LI Guang-peng, Research on technology of anchor head of bolting and grouting trolley [J], Construction Machinery and Equipment, 52, 9, pp. 84-87, (2021)
- [76] ZHOU He-yong, XZMG113 bolt trolley [Z]
- [77] NIU Kong-xiao, JING Liu-jie, CHEN Shuai, Et al., Research on kinematics of intelligent anchor and injection integrated jumbo [J], Machinery Design & Manufacture, 11, pp. 273-277, (2023)
- [78] WU Meng-jun, WU Qing-liang, Present situation and prospect of mechanization construction of mountain highway tunnels [J], Journal of Chongqing Jiaotong University (Natural Science), 39, 3, pp. 14-21, (2020)
- [79] WEIXia-peng, WANG Bo, CHEN Wei-xiang, Et al., Integrated construction equipment and mechanized supporting technology of prestressed anchor cable for Muzhailing highway tunnel in soft rock with large deformation [J], Tunnel Construction, 43, 1, pp. 161-172, (2023)
- [80] YAN Zhen-wei, Intelligent equipment is refreshing in the construction of underground hydropower projects [J], Yunnan Water Power, 37, 3, pp. 2-3, (2021)