Fine-Kinney fuzzy-based occupational health risk assessment for Workers in different construction trades

被引:3
作者
Li, Hongyang [1 ,2 ]
Wang, Yousong [2 ]
Chong, Dan [3 ]
Rajendra, Darmicka [4 ]
Skitmore, Martin [4 ]
机构
[1] Hohai Univ, Business Sch, Nanjing, Peoples R China
[2] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou, Peoples R China
[3] Shanghai Univ, Sch Management, Shanghai, Peoples R China
[4] Bond Univ, Fac Soc & Design, Robina, Qld 4226, Australia
基金
中国国家自然科学基金;
关键词
Occupational health; Risk assessment; Construction worker; Trades; Fine-Kinney method; Fuzzy inference system; ASSESSMENT MODEL; SAFETY; NETWORK; IDENTIFICATION; INDUSTRY; OUTDOOR; SYSTEMS; AHP;
D O I
10.1016/j.autcon.2024.105738
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper aims to enhance occupational health risk assessment for construction workers by introducing and validating two innovative models: the Occupational Health Risk Assessment Hierarchy Model (OHRAHM) and the Occupational Health Hazard Factor Risk Assessment Model (OHHFRAM). Utilizing the Fine-Kinney method (FKM), fuzzy sets, and the fuzzy inference system (FIS), these models provide a nuanced understanding of health risks in various construction trades. The models are demonstrated and validated in a specific region of China, including applying the FKM to different construction work types and evaluating occupational health across multiple trades. The principal results show the potential of OHRAHM and OHHFRAM in assessing risk magnitudes for various health factors, offering valuable insights for risk classification and proposing effective control measures. This paper addresses the need for improved health risk assessment models in the construction industry.
引用
收藏
页数:10
相关论文
共 71 条
[1]   Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP [J].
Abdelgawad, Mohamed ;
Fayek, Aminah Robinson .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (09) :1028-1036
[2]   Fuzzy-logic-based network for complex systems risk assessment: Application to ship performance analysis [J].
Abou, Seraphin C. .
ACCIDENT ANALYSIS AND PREVENTION, 2012, 45 :305-316
[3]  
Andaque G.A., 2022, Occupational and Environmental Safety and Health, VIV, P647, DOI [10.1007/978-3-031-12547-8_51, DOI 10.1007/978-3-031-12547-8_51]
[4]   Performance measurement of supply chain management using the analytical hierarchy process [J].
Bhagwat, R. ;
Sharma, M. K. .
PRODUCTION PLANNING & CONTROL, 2007, 18 (08) :666-680
[5]  
Borgheipour H, 2020, J HEALTH SAF WORK, V10, P5
[6]   Review of the Construction Labour Demand and Shortages in the EU [J].
Brucker Juricic, Belinda ;
Galic, Mario ;
Marenjak, Sasa .
BUILDINGS, 2021, 11 (01) :1-17
[7]   Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment [J].
Celik, Erkan ;
Gul, Muhammet .
AUTOMATION IN CONSTRUCTION, 2021, 127
[8]   Occupational health risk assessment based on actual dust exposure in a tunnel construction adopting roadheader in Chongqing, China [J].
Chen, Xiaofeng ;
Guo, Chun ;
Song, Junxiu ;
Wang, Xin ;
Cheng, Jianghao .
BUILDING AND ENVIRONMENT, 2019, 165
[9]   Managing operational risks along the oil supply chain [J].
Cigolini, Roberto ;
Rossi, Tommaso .
PRODUCTION PLANNING & CONTROL, 2010, 21 (05) :452-467
[10]   Safety risk identification system for metro construction on the basis of construction drawings [J].
Ding, L. Y. ;
Yu, H. L. ;
Li, Heng ;
Zhou, C. ;
Wu, X. G. ;
Yu, M. H. .
AUTOMATION IN CONSTRUCTION, 2012, 27 :120-137