Optimization Method for Installation Timing of Secondary Lining in Mechanized Tunnel Construction Using Drilling and Blasting Method

被引:0
|
作者
Chen, Zi-Quan [1 ]
Sun, Zhen-Yir [2 ]
Zhou, Zi-Han [1 ,3 ]
Li, Tian-Shcng [1 ]
Wang, Bo [1 ]
Xu, Guo-Wen [1 ]
Jiang, Chang-Wei [1 ]
机构
[1] Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Sichuan, Chengdu,610031, China
[2] Research Center of Tunneling and Underground Engineering, Ministry of Education, Beijing Jiaotong University, Beijing,100044, China
[3] Institute of Future Civil Engineering Science and Technology, Chongqing Jiaotong University, Chongqing,400074, China
基金
中国国家自然科学基金;
关键词
Blasting - Constitutive models - Construction equipment - Dynamic response - Dynamics - Elastoplasticity - Ground supports - Infill drilling - Linings - Rocks - Safety factor;
D O I
10.19721/j.cnki.1001-7372.2024.07.006
中图分类号
学科分类号
摘要
In recent years, China has vigorously advocated the construction of mechanized full-process tunnels using drilling and blasting methods. Although this modern construction mode of integrated mechanical equipment can effectively improve excavation efficiency, the overlong distance of mechanical equipment operation lines will seriously delay the timing of the secondary lining support, posing a threat to the stability of the surrounding rock support structure in weak and fractured rock layers. By investigating the relevant principles and control indicators for determining the timing of secondary lining support in tunnel design and construction specifications and sorting out the layout plan of the entire mechanized construction process, a dynamic optimization method for the timing of secondary lining support under the background of mechanized tunnel construction using the drilling and blasting method is proposed. This method integrates the elastic-plastic constitutive model of the surrounding rock, as well as the constitutive models of sprayed concrete, steel arch, anchor rod, and secondary lining. A complete history of the analytical method for the interaction between the surrounding rock and supporting structure is established to solve the bearing limit ratio and load sharing ratio. Finally, the distribution law of the safety factor of the surrounding rock was calculated and analyzed. The results indicate that the effectiveness of the proposed dynamic optimization method for the timing of secondary lining support in mechanized construction has been verified through case analysis: Different reinforced initial support schemes corresponding to a distance of 80 to 120 m for the deployment of mechanical equipment operation lines (the latest support time for secondary lining), and the secondary lining can share 7% to 13% of the surrounding rock load; the overall safety factors of the surrounding rock under the initial support scheme corresponding to the arrangement distances of 80, 100, and 120 m mechanical equipment operation lines are 1.19, 1.30, and 1.26, respectively, which meet the safety control benchmark. © 2024 Chang'an University. All rights reserved.
引用
收藏
页码:70 / 81
相关论文
共 50 条
  • [1] Research on Dynamic Response of Shallow Buried Tunnel Lining Constructed by Drilling and Blasting Method
    Wu, Bo
    Cui, Yaozhong
    Meng, Guowang
    Xu, Shixiang
    Xia, Chengming
    Li, Yicai
    Zhang, Yao
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2022, 2022
  • [2] Technologies for large cross-section subsea tunnel construction using drilling and blasting method
    Sun, Zhenyu
    Zhang, Dingli
    Fang, Qian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 141
  • [3] Risk assessment and the damping measures of the tunnel transfixion section using drilling and blasting construction method
    You, Pengfei
    Mou, Ruifang
    GEOMECHANICS AND GEOTECHNICS: FROM MICRO TO MACRO, VOLS 1 AND 2, 2011, : 1141 - 1145
  • [4] Experimental study on influence of blasting construction on secondary lining structure of tunnel
    Chen, Qiunan
    He, Yongchao
    Zou, Gen
    Li, Junjie
    Zhou, Xiangshi
    Zhou, Guangyu
    Journal of Railway Science and Engineering, 2020, 17 (03): : 676 - 681
  • [5] Construction Control Technology of Drilling and Blasting Method in Multi-arch Tunnel
    Zhao, Jiliang
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1293 - 1296
  • [6] On transfer technology of drilling-blasting construction method and shield construction method at the interface of a subsea tunnel and its application
    Du, B.
    Song, C.
    He, W.
    Li, K.
    PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 1855 - 1863
  • [7] Determination Method of Sensitive Interval and Safety Dose for the Construction of Subway Tunnel Drilling and Blasting
    Jia H.
    Liu D.
    Fang Z.
    Tian S.
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2021, 41 (01): : 23 - 29
  • [8] Development of an effective secondary tunnel lining method
    Matsunami, Y
    Date, S
    Hashimoto, H
    Aizato, K
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 875 - 878
  • [9] Intelligent classification model of surrounding rock of tunnel using drilling and blasting method
    Wang, Mingnian
    Zhao, Siguang
    Tong, Jianjun
    Wang, Zhilong
    Yao, Meng
    Li, Jiawang
    Yi, Wenhao
    UNDERGROUND SPACE, 2021, 6 (05) : 539 - 550
  • [10] Safety risk assessment of railway tunnel construction by drilling and blasting method in complex and dangerous areas
    Zhang F.
    Wu Z.
    Wang X.
    He Y.
    Journal of Railway Science and Engineering, 2023, 20 (05): : 1891 - 1901