Study on Multi-Level Safety Risk Assessment of Super 40 m Deep Foundation Pit Construction Adjacent to Subway
被引:0
|
作者:
Liang, Sen
论文数: 0引用数: 0
h-index: 0
机构:
China Construction Fourth Engineering Division Co., Ltd., Guangzhou, ChinaChina Construction Fourth Engineering Division Co., Ltd., Guangzhou, China
Liang, Sen
[1
]
Zhang, Shilong
论文数: 0引用数: 0
h-index: 0
机构:
Harbin Institute of Technology, Harbin, ChinaChina Construction Fourth Engineering Division Co., Ltd., Guangzhou, China
Zhang, Shilong
[2
]
Liao, Wei
论文数: 0引用数: 0
h-index: 0
机构:
China Construction Fourth Engineering Division Co., Ltd., Guangzhou, ChinaChina Construction Fourth Engineering Division Co., Ltd., Guangzhou, China
Liao, Wei
[1
]
Liu, Changyong
论文数: 0引用数: 0
h-index: 0
机构:
Harbin Institute of Technology, Harbin, ChinaChina Construction Fourth Engineering Division Co., Ltd., Guangzhou, China
Liu, Changyong
[2
]
Tan, Zhijie
论文数: 0引用数: 0
h-index: 0
机构:
China Construction Fourth Engineering Division Co., Ltd., Guangzhou, ChinaChina Construction Fourth Engineering Division Co., Ltd., Guangzhou, China
Tan, Zhijie
[1
]
Luo, Yingzhou
论文数: 0引用数: 0
h-index: 0
机构:
China Construction Fourth Engineering Division Co., Ltd., Guangzhou, ChinaChina Construction Fourth Engineering Division Co., Ltd., Guangzhou, China
Luo, Yingzhou
[1
]
Ai, Jiaojiao
论文数: 0引用数: 0
h-index: 0
机构:
China Construction Fourth Engineering Division Co., Ltd., Guangzhou, ChinaChina Construction Fourth Engineering Division Co., Ltd., Guangzhou, China
Ai, Jiaojiao
[1
]
机构:
[1] China Construction Fourth Engineering Division Co., Ltd., Guangzhou, China
[2] Harbin Institute of Technology, Harbin, China
来源:
ICCREM 2022: Carbon Peak and Neutrality Strategies of the Construction Industry - Proceedings of the International Conference on Construction and Real Estate Management 2022
|
2022年