Large construction projects in developing countries: A case study from Vietnam

被引:185
作者
Long, Nguyen Duy [1 ]
Ogunlana, Stephen [2 ]
Quang, Truong [3 ]
Lam, Ka Chi [1 ]
机构
[1] Department of Building/Construction, City University of Hong Kong, Kowloon
[2] School of Civil Engineering, Asian Institute of Technology, Klong Luang, Pathumthani 12120
[3] School of Management, Asian Institute of Technology, Klong Luang, Pathumthani 12120
关键词
Construction management; Large construction projects; Problems; Vietnam;
D O I
10.1016/j.ijproman.2004.03.004
中图分类号
学科分类号
摘要
Although various studies have been undertaken into the factors affecting delays, cost overruns, quality, safety, and productivity, etc. and other problems in specific types of projects, these studies seldom discuss common and general problems of construction projects. Thus, comprehensive studies on these problems are essential. Since the problems are rather contextual, the studies need to focus on a specific geographical area, country or region. This paper presents problems of large construction projects in Vietnam. Data analysis revealed that the problems could be grouped under five major factors: (1) incompetent designers/contractors, (2) poor estimation and change management, (3) social and technological issues, (4) site related issues, and (5) improper techniques and tools. © 2003 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:553 / 561
页数:8
相关论文
共 38 条
  • [1] Baldwin J.R., Manthei J.M., Causes of delays in the construction industry, J. Construct. Div. ASCE, 97, 1, pp. 00-87, (1971)
  • [2] Arditi R.D., Akan G.T., Gurdamar S., Reasons for delays in public projects in Turkey, Construct. Manage. Econom., 3, pp. 171-181, (1985)
  • [3] Sullivan A., Harris F.C., Delays on large construction projects, Int. J. Operat. Product. Manage., 6, 1, pp. 25-33, (1986)
  • [4] Mansfield N.R., Ugwu O.O., Doran T., Causes of delay and cost overruns in Nigerian construction projects, Int. J. Project Manage., 12, 4, pp. 254-260, (1994)
  • [5] Assaf S.A., Al-Khalil M., Al-Hazmi M., Causes of delay in large building construction projects, J. Manage. Eng., pp. 45-50, (1995)
  • [6] Ogunlana S.O., Promkuntong K., Jearkjirm V., Construction delays in a fast-growing economy: Comparing Thailand with other economies, Int. J. Project Manage., 14, 1, pp. 37-45, (1996)
  • [7] Chan D.W.M., Kumaraswary M.M., A study of causes of the factors affecting construction durations in Hong Kong, Construct. Manage. Econom., 13, pp. 319-333, (1995)
  • [8] Chan D.W.M., Kumaraswary M.M., A comparative study of causes of time overruns in Hong Kong construction projects, Int. J. Project Manage., 15, 1, pp. 53-63, (1997)
  • [9] Dissanayaka S.M., Kumaraswamy M.M., Evaluation of factors affecting time and cost performance in Hong Kong building projects, Eng., Construct. Architect. Manage., 6, 3, pp. 287-298, (1999)
  • [10] Al-Moumani H.A., Construction delay: A quantitative analysis, Int. J. Project Manage., 18, 1, pp. 51-59, (2000)