共 50 条
[32]
Evaluation of the Existing Road Net - a Presupposition of Planning and Construction of Roads.
[J].
Strasse und Autobahn,
1979, 30 (07)
:277-289
[33]
EN 50119 review - Impact on planning and construction of overhead contact lines
[J].
eb - Elektrische Bahnen,
2017, 115 (6-7)
:280-285
[34]
Planning urban highway reconstruction with traffic demand affected by construction schedule
[J].
1600, 752-761 (October 2005)
[35]
MULTI-PRODUCT PRODUCTION SCHEDULING IN AUTOMATED CONTINUOUS PROCESSES
[J].
BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS,
1975, 18 (118)
:450-457
[36]
Multi-level Feature Fusion for Automated Essay Scoring
[J].
Journal of Network Intelligence,
2023, 8 (01)
:76-88
[37]
Integrating 4D BIM and FDS to Simulate and Assess Fires in Buildings under Construction
[J].
Construction Research Congress 2022: Computer Applications, Automation, and Data Analytics - Selected Papers from Construction Research Congress 2022,
2022, 2-B
:977-986
[38]
Study on the effect of resistance sliding key chamber blasting construction of a hydropower station on adjacent buildings
[J].
Adv. Mater. Res.,
(2773-2776)
[39]
Control of garage exhaust fan noise in multi-family residential buildings
[J].
Int. Congr. Expo. Noise Control Eng., INTER-NOISE,
1600, (3899-3906)