The integrated circuit packaging scheduling problem (ICPSP): A case study

被引:0
作者
Pearn, W.L. [1 ]
Chung, S.H. [1 ]
Yang, M.H. [2 ]
Chen, C.Y. [1 ]
机构
[1] Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan
[2] Department of Business Management, National United University, Miao Li, Taiwan
来源
Int J Ind Eng Theory Appl Pract | / 3卷 / 296-307期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Costs - Integrated circuits - Parallel processing systems - Problem solving - Product development - Scheduling
引用
收藏
相关论文
empty
未找到相关数据