The integrated circuit packaging scheduling problem (ICPSP): A case study
被引:0
作者:
Pearn, W.L.
论文数: 0引用数: 0
h-index: 0
机构:
Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, TaiwanDepartment of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan
Pearn, W.L.
[1
]
Chung, S.H.
论文数: 0引用数: 0
h-index: 0
机构:
Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, TaiwanDepartment of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan
Chung, S.H.
[1
]
Yang, M.H.
论文数: 0引用数: 0
h-index: 0
机构:
Department of Business Management, National United University, Miao Li, TaiwanDepartment of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan
Yang, M.H.
[2
]
Chen, C.Y.
论文数: 0引用数: 0
h-index: 0
机构:
Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, TaiwanDepartment of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan
Chen, C.Y.
[1
]
机构:
[1] Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan
[2] Department of Business Management, National United University, Miao Li, Taiwan
来源:
Int J Ind Eng Theory Appl Pract
|
/
3卷
/
296-307期
关键词:
Compendex;
D O I:
暂无
中图分类号:
学科分类号:
摘要:
Costs - Integrated circuits - Parallel processing systems - Problem solving - Product development - Scheduling