Top Coal Weakening by Pulse Hydraulic Fracturing and Roof Cutting by Directional Hydraulic Fracturing for Control of Hanging Roof in the Face End of Fully Mechanized Top Coal Caving

被引:0
|
作者
Shao, Luying [1 ]
Huang, Bingxiang [1 ]
Zhao, Xinglong [1 ]
Li, Haoze [2 ]
Chen, Shuliang [2 ]
机构
[1] China Univ Min & Technol, State Key Lab Fine Explorat & Intelligent Dev Coal, Xuzhou 221116, Peoples R China
[2] China Univ Min & Technol, Sch Low Carbon Energy & Power Engn, Xuzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Coal mines;
D O I
10.2113/2024/lithosphere_2024_150
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Due to the supporting effect of the coal pillar on the side of the roadway, there is often a problem of the top coal and roof in the working face end not collapsing in time. The single directional hydraulic fracturing method cannot directionally cut off the top coal of the working face end. To overcome the above shortcomings, this article first proposes a method of controlling top coal and roof in the working face end by pulse and directional hydraulic fracturing. The method of using pulse hydraulic fracturing to weaken the top coal and directional hydraulic fracturing to cut off the roof to induce rock pressure to break the coal is used to control the timely collapse of the top coal and roof in the working face end. When the vertical stress on the top coal is greater than the strength of the weakened top coal, the top coal and roof begin to collapse. The vertical displacement of the weakened top coal and the cut roof gradually decreases from low to high, and the caving top coal and roof finally fill the goaf. The maximum reduction in stress concentration of coal pillar is about 75%. Then, the principles for determining the parameters of this method were provided. Finally, the industrial experiment was conducted in the coal mine. The construction water pressure of the roof is between 30 and 40 MPa. The construction water pressure of top coal ranges from 8 to 16 MPa, with an amplitude of approximately 4 MPa. Directional crack is formed within an area of 3.3 m in the direction of the adjacent roof borehole. A crack network is formed within a 4 m area near the top coal borehole. After hydraulic fracturing, the top coal and roof in the working face end collapse with mining.
引用
收藏
页码:1 / 19
页数:19
相关论文
共 50 条
  • [1] Directional hydraulic fracturing in difficult caving roof control and coal degassing
    Lekontsev, Yu. M.
    Sazhin, P. V.
    JOURNAL OF MINING SCIENCE, 2014, 50 (05) : 914 - 917
  • [2] Directional hydraulic fracturing in difficult caving roof control and coal degassing
    Yu. M. Lekontsev
    P. V. Sazhin
    Journal of Mining Science, 2014, 50 : 914 - 917
  • [3] ROOF WEAKENING OF HYDRAULIC FRACTURING FOR CONTROL OF HANGING ROOF IN THE FACE END OF HIGH GASSY COAL LONGWALL MINING: A CASE STUDY
    Huang, Bingxiang
    Wang, Youzhuang
    ARCHIVES OF MINING SCIENCES, 2016, 61 (03) : 601 - 615
  • [4] Study on the Mechanism of a Hanging Roof at a Difficult Caving End in a Fully-Mechanized Top Coal Caving Face
    Liu, Hongtao
    Hao, Cheng
    Han, Zijun
    Liu, Qinyu
    Wang, Haozhu
    Liang, Jialu
    Zhang, Dandan
    SUSTAINABILITY, 2023, 15 (01)
  • [5] TECHNOLOGY AND PRACTICE OF THE ROOF-CAVING OF HYDRAULIC FRACTURING IN A FULLY MECHANIZED CAVING FACE
    Deng, Qigen
    Zhao, Fajun
    Li, Hong
    Yin, Jingping
    Zhang, Tao
    Wei, Junjie
    THERMAL SCIENCE, 2021, 25 (03): : 2117 - 2126
  • [6] Longwall top coal caving (LTCC) mining technologies with roof softening by hydraulic fracturing method
    Klishin, V.
    Nikitenko, S.
    Opruk, G.
    XI ALL-RUSSIAN SCIENTIFIC AND PRACTICAL CONFERENCE (WITH INTERNATIONAL PARTICIPATION) AUTOMATION SYSTEMS IN EDUCATION, SCIENCE AND PRODUCTION, 2017, 2018, 354
  • [7] Cavability control by hydraulic fracturing for top coal caving in hard thick coal seams
    Huang, Bingxiang
    Wang, Youzhuang
    Cao, Shenggen
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2015, 74 : 45 - 57
  • [8] Hydraulic fracturing of hard top coal and roof for controlling gas during the initial mining stages in longwall top coal caving: a case study
    Huang, Bingxiang
    Cheng, Qingying
    Zhao, Xinglong
    Kang, Chao
    JOURNAL OF GEOPHYSICS AND ENGINEERING, 2018, 15 (06) : 2492 - 2506
  • [9] Study on the Structural System of Roof in Fully Mechanized Top Coal Caving
    Shen Jie
    Meng Da
    Wei Like
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2041 - +
  • [10] Directional hydraulic fracturing to control hard-roof rockburst in coal mines
    Jun, Fan
    Dou Linming
    Hua, He
    Du Taotao
    Zhang Shibin
    Bing, Gui
    Sun Xinglin
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2012, 22 (02) : 177 - 181