Path Planning Strategy for Implementing a Machine Control System in Grader Operations

被引:0
作者
Kim, Jae-Yoon [1 ]
Seo, Jong-Won [2 ]
Na, Wongi S. [1 ]
Kim, Sung-Keun [1 ]
机构
[1] Seoul Natl Univ Sci & Technol, Dept Civil Engn, Seoul 01811, South Korea
[2] Hanyang Univ, Dept Biomed Engn, Seoul 04763, South Korea
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 20期
关键词
machine control; path planning; earthmoving operations; construction automation; grader;
D O I
10.3390/app14209432
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The construction industry faces challenges of labor shortages and safety concerns. Machine control (MC) technology offers a solution, particularly for graders in earthmoving operations. This study introduces a path-planning algorithm using initial site data, 3D target models, and equipment specifications to create optimal work paths for graders. The algorithm minimizes data exchange and adjusts for varying road widths and curves, enhancing grading efficiency and accuracy. A case study on a road construction site in South Korea validated the algorithm's practical application. The proposed system aims to improve construction efficiency, safety, and cost-effectiveness, contributing to the advancement of construction automation technology.
引用
收藏
页数:18
相关论文
共 35 条
[1]   Cyber-physical systems integration of building information models and the physical construction [J].
Akanmu, Abiola ;
Anumba, Chimay J. .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (05) :516-535
[2]  
Al-Mamlook R., 2020, Am. J. Environ. Sci. Eng, V4, P24, DOI [DOI 10.11648/J.AJESE.20200402.13, 10.11648/j.ajese.20200402]
[3]   Cyber-physical systems development for construction applications [J].
Anumba, Chinemelu J. ;
Akanmu, Abiola ;
Yuan, Xiao ;
Kan, Congwen .
FRONTIERS OF ENGINEERING MANAGEMENT, 2021, 8 (01) :72-87
[4]  
Azar E.R., 2015, Effectiveness of Automated Machine Guidance Technology in Productivity Improvement: Case Study
[5]  
Azar ER, 2017, J INF TECHNOL CONSTR, V22, P247
[6]  
Dunston P.S., 2009, Practices for Seamless Transmission of Design Data from Design Phase to Construction Equipment Operation: A Synthesis Study
[7]  
Hammad A, 2013, J INF TECHNOL CONSTR, V18, P162
[8]  
Hinze J, 2017, PRACT PERIOD STRUCT, V22, DOI [10.1061/(ASCE)SC.1943-5576.0000336, 10.1061/(ASCE)SC.19435576.0000336]
[9]   Path planning for autonomous bulldozers [J].
Hirayama, Masami ;
Guivant, Jose ;
Katupitiya, Jayantha ;
Whitty, Mark .
MECHATRONICS, 2019, 58 :20-38
[10]   Assessment of Emissions and Energy Consumption for Construction Machinery in Earthwork Activities by Incorporating Real-World Measurement and Discrete-Event Simulation [J].
Hong, Beichuan ;
Lu, Lin .
SUSTAINABILITY, 2022, 14 (09)