Critical Factors Driving Construction Project Performance in Integrated 5D Building Information Modeling

被引:0
作者
Sun, Hui [1 ,2 ]
Khoo, Terh Jing [2 ]
Esa, Muneera [2 ]
Mahdiyar, Amir [3 ]
Li, Jiguang [4 ,5 ]
机构
[1] Beibu Gulf Univ, Sch Civil Engn & Architecture, Qinzhou 535000, Peoples R China
[2] Univ Sains Malaysia, Sch Housing Bldg & Planning, Gelugor 11800, Pulau Pinang, Malaysia
[3] Univ Cent Florida, Sch Modeling Simulat & Training, Urban Digital Twin Lab, Orlando, FL 32826 USA
[4] Nanning Normal Univ, Sch Nat Resources & Surveying, Nanning 530001, Peoples R China
[5] Nanning Normal Univ, Key Lab Environm Change & Resource Use Beibu Gulf, Minist Educ, Nanning 530001, Peoples R China
基金
中国国家自然科学基金;
关键词
5D BIM evolution; critical factors; key performance indicators; systematic literature review; DECISION-MAKING; BIM; MANAGEMENT; PERSPECTIVE; TECHNOLOGY; CAPABILITY; INNOVATION; BENEFITS; SCIENCE; TIME;
D O I
10.3390/buildings14092807
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Timeliness, budget consciousness, and quality are critical to the success of a project, and become increasingly challenging with increased project complexity. Five-dimensional building information modeling (BIM) integrates cost and schedule data with a 3D model, and enhances project management by addressing budgeting, timelines, and visualization simultaneously. However, a comprehensive assessment of 5D BIM's impact on key performance indicators is currently lacking. This research aims to identify the critical factors influencing the adoption of 5D BIM and its impact on key project performance indicators. A thorough systematic literature review and qualitative analysis were conducted to achieve this goal. Relevant articles from the past decade (2014-2023) were examined from the Scopus and Web of Science databases, of which 222 were selected and screened using PRISMA procedures. This research found consistent and rapid updating of keywords, highlighting the dynamic evolution of 5D BIM and its expanding applications in the construction industry. Thirty critical factors affecting the adoption of 5D BIM were identified and categorized into the following six groups based on the technology-organization-environment (TOE) framework: technology, organization, environment, operator, project, and government policy. The 15 factors driving construction project performance in integrated 5D BIM were divided into cost, time, and quality performance based on key performance indicators. This review offers innovative insights into 5D BIM adoption, and can aid stakeholders in developing effective 5D BIM implementations.
引用
收藏
页数:32
相关论文
共 46 条
  • [31] Implementation of Building Information modeling in Vietnamese infrastructure construction: A case study of institutional influences on a bridge project
    Bui, Nam
    ELECTRONIC JOURNAL OF INFORMATION SYSTEMS IN DEVELOPING COUNTRIES, 2020, 86 (04):
  • [32] Integrating Parametric Analysis with Building Information Modeling to Improve Energy Performance of Construction Projects
    Najjar, Mohammad K.
    Tam, Vivian W. Y.
    Di Gregorio, Leandro Torres
    Evangelista, Ana Catarina Jorge
    Hammad, Ahmed W. A.
    Haddad, Assed
    ENERGIES, 2019, 12 (08)
  • [33] Structural Equation Modeling to Analyze the Critical Driving Factors and Paths for Off-site Construction in China
    Mao, Chao
    Liu, Guiwen
    Shen, Liyin
    Wang, Xiangyu
    Wang, Jun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (08) : 2678 - 2690
  • [34] Views from construction professionals on hospital project construction management using modular prefabricated materials and building information modeling support
    Alireza Abbasi
    Vahid Saberi
    Hosein Eghbali
    Hamid Saberi
    Architecture, Structures and Construction, 2024, 4 (1): : 55 - 69
  • [35] A Relationship Framework for Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance
    Wong, P. F.
    Salleh, H.
    Rahim, F. A. M.
    INFORMES DE LA CONSTRUCCION, 2015, 67 (540)
  • [36] Performance Measurement and Analysis of Building Information Modeling (BIM) Applications in the Railway Infrastructure Construction Phase
    Shin, Min-Ho
    Kim, Hwan-Yong
    Liao, Jian-Feng
    APPLIED SCIENCES-BASEL, 2024, 14 (02):
  • [37] The integration of Building Information Modeling (BIM) and Integrated Project Delivery (IPD) in industrial buildings: Evidence from China
    Wei, Jianguo
    Shi, Song
    Xia, Hui
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2021, 21 (06) : 1711 - 1726
  • [38] Empirical investigation of building information modelling (BIM) staff's impact on construction project performance: evidence in Kenya
    Chen, Yuan
    Gacheri, Hazel Faith
    Sun, Gangzhu
    FRONTIERS IN BUILT ENVIRONMENT, 2024, 10
  • [39] Whole Life Critical Factors Influencing Construction Project Performance for Different Objectives: Evidence from Thailand
    Homthong, Samart
    Moungnoi, Wutthipong
    Charoenngam, Chotchai
    BUILDINGS, 2024, 14 (04)
  • [40] Dynamic Analysis of Construction Safety Risk and Visual Tracking of Key Factors based on Behavior-based Safety and Building Information Modeling
    Lee, Pin-Chan
    Wei, Junhao
    Ting, Hsin-I
    Lo, Tzu-Ping
    Long, Danbing
    Chang, Luh-Maan
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (10) : 4155 - 4167