Critical Factors Driving Construction Project Performance in Integrated 5D Building Information Modeling

被引:0
作者
Sun, Hui [1 ,2 ]
Khoo, Terh Jing [2 ]
Esa, Muneera [2 ]
Mahdiyar, Amir [3 ]
Li, Jiguang [4 ,5 ]
机构
[1] Beibu Gulf Univ, Sch Civil Engn & Architecture, Qinzhou 535000, Peoples R China
[2] Univ Sains Malaysia, Sch Housing Bldg & Planning, Gelugor 11800, Pulau Pinang, Malaysia
[3] Univ Cent Florida, Sch Modeling Simulat & Training, Urban Digital Twin Lab, Orlando, FL 32826 USA
[4] Nanning Normal Univ, Sch Nat Resources & Surveying, Nanning 530001, Peoples R China
[5] Nanning Normal Univ, Key Lab Environm Change & Resource Use Beibu Gulf, Minist Educ, Nanning 530001, Peoples R China
基金
中国国家自然科学基金;
关键词
5D BIM evolution; critical factors; key performance indicators; systematic literature review; DECISION-MAKING; BIM; MANAGEMENT; PERSPECTIVE; TECHNOLOGY; CAPABILITY; INNOVATION; BENEFITS; SCIENCE; TIME;
D O I
10.3390/buildings14092807
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Timeliness, budget consciousness, and quality are critical to the success of a project, and become increasingly challenging with increased project complexity. Five-dimensional building information modeling (BIM) integrates cost and schedule data with a 3D model, and enhances project management by addressing budgeting, timelines, and visualization simultaneously. However, a comprehensive assessment of 5D BIM's impact on key performance indicators is currently lacking. This research aims to identify the critical factors influencing the adoption of 5D BIM and its impact on key project performance indicators. A thorough systematic literature review and qualitative analysis were conducted to achieve this goal. Relevant articles from the past decade (2014-2023) were examined from the Scopus and Web of Science databases, of which 222 were selected and screened using PRISMA procedures. This research found consistent and rapid updating of keywords, highlighting the dynamic evolution of 5D BIM and its expanding applications in the construction industry. Thirty critical factors affecting the adoption of 5D BIM were identified and categorized into the following six groups based on the technology-organization-environment (TOE) framework: technology, organization, environment, operator, project, and government policy. The 15 factors driving construction project performance in integrated 5D BIM were divided into cost, time, and quality performance based on key performance indicators. This review offers innovative insights into 5D BIM adoption, and can aid stakeholders in developing effective 5D BIM implementations.
引用
收藏
页数:32
相关论文
共 46 条
  • [11] An integrated Building Information Modelling, Integrated Project Delivery and Lean Construction Maturity Model
    Rashidian, Sara
    Drogemuller, Robin
    Omrani, Sara
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2024, : 1454 - 1470
  • [12] INTEGRATING BIM (BUILDING INFORMATION MODELING) INTO LEAN PROJECT CONSTRUCTION: A NOVEL FUZZY METHODOLOGY
    Seck, Cheikh Moustapha Djamil
    Delgoshaei, Aidin
    Ariffin, Mohd Khairol Anuar
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2024, 31 (05): : 1044 - 1074
  • [13] Factors affecting adoption of building information modeling in construction projects: A case of Vietnam
    Nguyen Van Tam
    Tran Ngoc Diep
    Nguyen Quoc Toan
    Nguyen Le Dinh Quy
    COGENT BUSINESS & MANAGEMENT, 2021, 8 (01):
  • [14] Driving Factors for the Adoption of Digital Twin Technology Implementation for Construction Project Performance in Nigeria
    Arowoiya, Victor Adetunji
    Oke, Ayodeji Emmanuel
    Ojo, Lekan Damilola
    Adelusi, Ayomide Oluwafemi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (01)
  • [15] Critical success factors for implementing building information modeling and sustainability practices in construction projects: A Delphi survey
    Olawumi, Timothy O.
    Chan, Daniel W. M.
    SUSTAINABLE DEVELOPMENT, 2019, 27 (04) : 587 - 602
  • [16] Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation
    Zhao, Yu
    Jing, Haotian
    Yu, Miao
    Li, Jiamin
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, : 826 - 839
  • [17] Construction Project Quality Management using Building Information Modeling 360 Field
    Phong Thanh Nguyen
    Thu Anh Nguyen
    Tin Minh Cao
    Khoa Dang Vo
    Vy Dang Bich Huynh
    Quyen Le Hoang Thuy To Nguyen
    Thanh Phan
    Loan Phuc Le
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2018, 9 (10) : 228 - 233
  • [18] Key Factors Affecting Steel Construction Projects' Performance by Adopting Building Information Modeling (BIM) in Egypt
    Soliman, Shorouk M.
    Elhegazy, Hosam Mostafa
    Zhang, Jiansong
    Mahdi, Ibrahim M.
    Dessouki, Abdelrahim Khalil
    Rashid, Ibrahim Abdel
    COMPUTING IN CIVIL ENGINEERING 2023-VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2024, : 442 - 450
  • [19] Building information modeling (BIM)-based modular integrated construction risk management-Critical survey and future needs
    Darko, Amos
    Chan, Albert P. C.
    Yang, Yang
    Tetteh, Mershack O.
    COMPUTERS IN INDUSTRY, 2020, 123
  • [20] RETRACTED: Value Proposition for Enabling Construction Project Innovation by Applying Building Information Modeling (Retracted Article)
    Liu, Hui
    Ju, Qianqian
    Zhao, Na
    Li, Hujun
    Skibniewski, Miroslaw J.
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022