Critical Factors Driving Construction Project Performance in Integrated 5D Building Information Modeling

被引:0
作者
Sun, Hui [1 ,2 ]
Khoo, Terh Jing [2 ]
Esa, Muneera [2 ]
Mahdiyar, Amir [3 ]
Li, Jiguang [4 ,5 ]
机构
[1] Beibu Gulf Univ, Sch Civil Engn & Architecture, Qinzhou 535000, Peoples R China
[2] Univ Sains Malaysia, Sch Housing Bldg & Planning, Gelugor 11800, Pulau Pinang, Malaysia
[3] Univ Cent Florida, Sch Modeling Simulat & Training, Urban Digital Twin Lab, Orlando, FL 32826 USA
[4] Nanning Normal Univ, Sch Nat Resources & Surveying, Nanning 530001, Peoples R China
[5] Nanning Normal Univ, Key Lab Environm Change & Resource Use Beibu Gulf, Minist Educ, Nanning 530001, Peoples R China
基金
中国国家自然科学基金;
关键词
5D BIM evolution; critical factors; key performance indicators; systematic literature review; DECISION-MAKING; BIM; MANAGEMENT; PERSPECTIVE; TECHNOLOGY; CAPABILITY; INNOVATION; BENEFITS; SCIENCE; TIME;
D O I
10.3390/buildings14092807
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Timeliness, budget consciousness, and quality are critical to the success of a project, and become increasingly challenging with increased project complexity. Five-dimensional building information modeling (BIM) integrates cost and schedule data with a 3D model, and enhances project management by addressing budgeting, timelines, and visualization simultaneously. However, a comprehensive assessment of 5D BIM's impact on key performance indicators is currently lacking. This research aims to identify the critical factors influencing the adoption of 5D BIM and its impact on key project performance indicators. A thorough systematic literature review and qualitative analysis were conducted to achieve this goal. Relevant articles from the past decade (2014-2023) were examined from the Scopus and Web of Science databases, of which 222 were selected and screened using PRISMA procedures. This research found consistent and rapid updating of keywords, highlighting the dynamic evolution of 5D BIM and its expanding applications in the construction industry. Thirty critical factors affecting the adoption of 5D BIM were identified and categorized into the following six groups based on the technology-organization-environment (TOE) framework: technology, organization, environment, operator, project, and government policy. The 15 factors driving construction project performance in integrated 5D BIM were divided into cost, time, and quality performance based on key performance indicators. This review offers innovative insights into 5D BIM adoption, and can aid stakeholders in developing effective 5D BIM implementations.
引用
收藏
页数:32
相关论文
共 46 条
  • [1] Navigating the Adoption of 5D Building Information Modeling: Insights from Norway
    Hosamo, Haidar Hosamo
    Rolfsen, Christian Nordahl
    Zeka, Florent
    Sandbeck, Sigurd
    Said, Sami
    Saetre, Morten Andre
    INFRASTRUCTURES, 2024, 9 (04)
  • [2] A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM)
    Lu, Qiqi
    Won, Jongsung
    Cheng, Jack C. P.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (01) : 3 - 21
  • [3] The use of a virtual building design and construction model for developing an effective project concept in 5D environment
    Popov, Vladimir
    Juocevicius, Virgaudas
    Migilinskas, Darius
    Ustinovichius, Leonas
    Mikalauskas, Saulius
    AUTOMATION IN CONSTRUCTION, 2010, 19 (03) : 357 - 367
  • [4] Critical Success Factors for Building Information Modeling Implementation as a Sustainable Construction Practice in the UAE
    AbuMoeilak, Lama
    AlQuraidi, Alya
    AlZarooni, Abdullah
    Beheiry, Salwa
    BUILDINGS, 2023, 13 (06)
  • [5] THE PROPENSITY OF BUILDING INFORMATION MODELLING AND INTEGRATED PROJECT DELIVERY IN BUILDING CONSTRUCTION PROJECT
    Salleh, Rozana Mohamed
    Mustaffa, Nur Emma
    Rahiman, Nafisah Abdul
    Ariffin, Hamizah Liyana Tajul
    Othman, Norazam
    INTERNATIONAL JOURNAL OF BUILT ENVIRONMENT AND SUSTAINABILITY, 2019, 6 (1-2): : 83 - 90
  • [6] Building Information Modeling (BIM) for Construction Project Schedule Management: A Review
    Nguyen, Tuan Anh
    Nguyen, Tu Anh
    Van Tran, The
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2024, 14 (02) : 13133 - 13142
  • [7] Integration of building information modeling and project management in construction project life cycle
    Wang, Taige
    Chen, Han-Mei
    AUTOMATION IN CONSTRUCTION, 2023, 150
  • [8] Critical success factors for implementing integrated construction project delivery
    Whang, Seoung-Wook
    Park, Kenneth Sungho
    Kim, Sangyong
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (10) : 2432 - 2446
  • [9] Critical Success Factors and a Contractual Framework for Construction Projects Adopting Building Information Modeling in Vietnam
    Dao, Thuy-Ninh
    Chen, Po-Han
    Nguyen, The-Quan
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2021, 19 (01) : 85 - 102
  • [10] Critical Success Factors of Building Information Modeling Implementation
    Ozorhon, Beliz
    Karahan, Ugur
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (03)