Turbine repair at Nesjavellir geothermal power plant: An Icelandic case study

被引:0
|
作者
Atlason, R.S. [1 ]
Gunnarsson, A. [1 ]
Unnthorsson, R. [1 ]
机构
[1] University of Iceland, Department of Industrial Engineering, Mechanical Engineering and Computer Science, Centre for Productivity, Performance and Processes, Hjardarhagi 6, Reykjavik,107, Iceland
关键词
D O I
暂无
中图分类号
学科分类号
摘要
11
引用
收藏
页码:166 / 170
相关论文
共 50 条
  • [1] Turbine repair at Nesjavellir geothermal power plant: An Icelandic case study
    Atlason, R. S.
    Gunnarsson, A.
    Unnthorsson, R.
    GEOTHERMICS, 2015, 53 : 166 - 170
  • [2] Turbine repair at Nesjavellir geothermal power plant: An Icelandic case study
    Atlason, R.S.
    Gunnarsson, A.
    Unnthorsson, R.
    Geothermics, 2015, 53 : 166 - 170
  • [3] Nesjavellir geothermal co-generation power plant
    Gunnarsson, Arni
    Steingrimsson, Benedikt S.
    Gunnlaugsson, Einar
    Magnusson, Johann
    Maack, Runolfur
    Geothermics, 1992, 21 (04) : 559 - 583
  • [4] Environmental Impact Assessment of Nesjavellir Geothermal Power Plant for Heat and Electricity Production
    Mainar-Toledo, Maria Dolores
    Diaz-Ramirez, Maryori
    Egilsson, Snorri J.
    Zuffi, Claudio
    Manfrida, Giampaolo
    Leiva, Hector
    SUSTAINABILITY, 2023, 15 (18)
  • [5] Modelling and Simulation of Existing Geothermal Power Plant: A Case Study of Darajat Geothermal Power Plant
    Sukra, K. F. A.
    Permana, D. I.
    Adriansyah, W.
    INTERNATIONAL JOURNAL OF THERMODYNAMICS, 2023, 26 (02) : 13 - 20
  • [6] Optimization of an integrated gas turbine geothermal power plant
    Bidini, G
    Desideri, U
    Di Maria, F
    Baldacci, A
    Papale, R
    Sabatelli, F
    ENERGY CONVERSION AND MANAGEMENT, 1998, 39 (16-18) : 1945 - 1956
  • [7] Use of the Kalina cycle as a bottoming cycle in a geothermal power plant: Case study of the Wayang Windu geothermal power plant
    Prananto, Lukman Adi
    Zaini, Ilman Nuran
    Mahendranata, Bobby Irawan
    Juangsa, Firman Bagja
    Aziz, Muhammad
    Soelaiman, Tubagus Ahmad Fauzi
    APPLIED THERMAL ENGINEERING, 2018, 132 : 686 - 696
  • [8] Performance Investigation of Geothermal Power Plant Based on Exergy and Exergoeconomic Analyses (Case Study: Sarulla Geothermal Power Plant)
    Sinaga, R. H. M.
    Saputra, D. W.
    9TH ANNUAL BASIC SCIENCE INTERNATIONAL CONFERENCE 2019 (BASIC 2019), 2019, 546
  • [9] Retrofitting a geothermal power plant to optimize performance:: A case study
    Kanoglu, M
    Çengel, YA
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1999, 121 (04): : 295 - 301
  • [10] Optimizing the Utility Power of a Geothermal Power Plant using Variable Frequency Drive (VFD) (Case Study: Sibayak Geothermal Power Plant)
    Sinaga, R. H. M.
    Manik, Y.
    INTERNATIONAL CONFERENCE ON SCIENCE, INFRASTRUCTURE TECHNOLOGY AND REGIONAL DEVELOPMENT (ICOSITER) 2016: ENERGY SECURITY FOR ENHANCING NATIONAL COMPETITIVENESS, 2018, 124