Grouted connection tests in development of precast bent cap system

被引:1
|
作者
Matsumoto, Eric E. [1 ]
Kreger, Michael E. [2 ]
Waggoner, Mark C. [3 ]
Sumen, Guclu [4 ]
机构
[1] Department of Civil Engineering, California State Univ., Sacramento, 6000 J Street, Sacramento, CA 95819-6029, United States
[2] Department of Civil Engineering, University of Texas at Austin, ECJ 4.8, Austin, TX 78712, United States
[3] Walter P. Moore and Associates, 3131 Eastside, Houston, TX 77098, United States
[4] Nelson Architectural Engineers, Inc., 3303 Lee, Suite 440, Dallas, TX 75219, United States
关键词
Bolted connections - Grout pockets - Grouted connection tests - Grouted ducts - Precast bent cap system;
D O I
10.3141/1814-07
中图分类号
学科分类号
摘要
引用
收藏
页码:55 / 64
相关论文
共 50 条
  • [1] Grouted connection tests in development of precast bent cap system
    Matsumoto, EE
    Kreger, ME
    Waggoner, MC
    Sumen, G
    DESIGN OF STRUCTURES 2002: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2002, (1814): : 55 - 64
  • [2] Development of a precast concrete bent-cap system
    Department of Civil Engineering, California State University, Sacramento, United States
    不详
    不详
    不详
    不详
    PCI J, 2008, 3 (74-99):
  • [3] Behaviour of a column-bent cap connection for a precast DSCT column
    Won, Deok Hee
    Kim, Seungjun
    Seo, Jihye
    Lim, Jung Hyun
    Kang, Young Jong
    MAGAZINE OF CONCRETE RESEARCH, 2018, 70 (02) : 96 - 107
  • [4] GROUTED SLEEVE CONNECTION FOR PRECAST CONCRETE MEMBERS
    Espoir, Kulondwa Kahama
    Xie Fuzhe
    Geng Haojie
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2020, 30 (04): : 435 - 447
  • [5] New precast bent cap system: Saving Texas time and money
    Jones, Kathleen
    Vogel, John
    TR News, 2001, (212): : 40 - 41
  • [6] Quasi-Static Cyclic Tests of Precast Two-Column Bent Connected with Both Grouted Splice Sleeves and Grouted Central Tenon
    Zhuo, Saiyang
    Tong, Teng
    Lu, Gan
    Zhuo, Weiding
    Liu, Zhao
    Huang, Jingzhi
    APPLIED SCIENCES-BASEL, 2023, 13 (16):
  • [7] Impact performance of precast concrete columns with grouted sleeve connection
    Zhao W.-C.
    Ye J.-H.
    Zhou Z.
    Zhendong Gongcheng Xuebao/Journal of Vibration Engineering, 2023, 36 (01): : 225 - 234
  • [8] Shear performance analysis of grouted sleeve connection region in precast assembled columns
    Liu, Hongtao
    Kong, Pengchao
    Chen, Wenxiao
    Du, Xiuli
    BULLETIN OF EARTHQUAKE ENGINEERING, 2025, : 2085 - 2112
  • [9] Quasi-static tests of CFST embedded RC column-to-precast cap beam with socket connection
    Zhang, Guangda
    Han, Qiang
    Xu, Kun
    Du, Xiuli
    He, Weili
    ENGINEERING STRUCTURES, 2021, 241
  • [10] Cyclic test on a precast reinforced concrete column-to-foundation grouted duct connection
    Tullini, Nerio
    Minghini, Fabio
    BULLETIN OF EARTHQUAKE ENGINEERING, 2020, 18 (04) : 1657 - 1691