Fast optimal decision of short-term dispatch of Three Gorges and Gezhouba cascade hydropower stations with navigation demand considered

被引:0
作者
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China [1 ]
机构
来源
Xitong Gongcheng Lilum yu Shijian | / 5卷 / 1345-1350期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Fast optimal decision of short-term dispatch of Three Gorges and Gezhouba cascade hydropower stations was developed with navigation and short-term electricity generation considered. Evaluation method of navigation condition and strategy of fast optimal decision of short-term dispatch were put forward with navigation guaranty rate, reservoir level guaranty rate and average reservoir level as decision indexes. Results show that multi feasible or best dispatch solutions of Three Gorges and Gezhouba cascade hydropower stations can be rapidly proposed by fast optimal decision strategy when schedule of Three Gorges hydropower station has been planned. And the best one not only satisfies navigation demand, but also increases daily electricity generation.
引用
收藏
相关论文
共 50 条
[21]   Short-term optimal scheduling of head-dependent cascaded hydropower stations [J].
Jia, Jiangtao ;
Guan, Xiaohong ;
Zhai, Qiaozhu .
Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2009, 33 (13) :13-16
[22]   Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm [J].
Xie, Wei ;
Ji, Chang-ming ;
Yang, Zi-jun ;
Zhang, Xiao-xing .
WATER SCIENCE AND ENGINEERING, 2012, 5 (01) :46-58
[24]   Short-term optimal scheduling of cascaded hydropower stations based on sequential quadratic programming [J].
Wu, Jiekang ;
Tang, Li ;
Han, Junfeng .
Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2010, 30 (SUPPL.) :43-48
[25]   Short-term scheduling methods for peak load responding demand of cascade hydropower stations in small and medium-sized river basins [J].
Cheng X. ;
Chen Q. ;
Li X. ;
Peng H. ;
Zhong H. ;
Li W. .
Shuili Xuebao/Journal of Hydraulic Engineering, 2023, 54 (02) :159-171
[26]   Application of Genetic Algorithm and Annealing Genetic Algorithm in Short-term Optimal Operation and Economical Operation of Three Gorges Cascade [J].
Liu Guoshuai ;
Yang Kan ;
Zhou Ran ;
Zheng Jiao .
2012 INTERNATIONAL CONFERENCE ON MODERN HYDRAULIC ENGINEERING, 2012, 28 :81-84
[27]   Metamodeling the optimal total revenues of the short-term optimization of a hydropower cascade under uncertainty [J].
Piguet, Antoine ;
Benefice, Astrig ;
Bontron, Guillaume ;
Helbert, Celine ;
Vial, Gregory .
SCIENCE AND TECHNOLOGY FOR ENERGY TRANSITION, 2023, 78
[28]   Short-term optimal scheduling of cascade hydropower plants with reverse-regulating effects [J].
Su, Chengguo ;
Wang, Peilin ;
Yuan, Wenlin ;
Wu, Yang ;
Jiang, Feng ;
Wu, Zening ;
Yan, Denghua .
RENEWABLE ENERGY, 2022, 199 :395-406
[29]   Short-term load distribution model for cascade giant hydropower stations with complex hydraulic and electrical connections [J].
Wu, Yuqiang ;
Liao, Shengli ;
Liu, Benxi ;
Cheng, Chuntian ;
Zhao, Hongye ;
Fang, Zhou ;
Lu, Jia .
RENEWABLE ENERGY, 2024, 232
[30]   Cascade hydropower stations short-term operation for load distribution considering water level synchronous variation [J].
Lei, Kaixuan ;
Chang, Jianxia ;
Wang, Yimin ;
Guo, Aijun ;
Huang, Mengdi ;
Xu, Bo .
RENEWABLE ENERGY, 2022, 196 :683-693