Fast optimal decision of short-term dispatch of Three Gorges and Gezhouba cascade hydropower stations with navigation demand considered

被引:0
|
作者
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China [1 ]
机构
来源
Xitong Gongcheng Lilum yu Shijian | / 5卷 / 1345-1350期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Fast optimal decision of short-term dispatch of Three Gorges and Gezhouba cascade hydropower stations was developed with navigation and short-term electricity generation considered. Evaluation method of navigation condition and strategy of fast optimal decision of short-term dispatch were put forward with navigation guaranty rate, reservoir level guaranty rate and average reservoir level as decision indexes. Results show that multi feasible or best dispatch solutions of Three Gorges and Gezhouba cascade hydropower stations can be rapidly proposed by fast optimal decision strategy when schedule of Three Gorges hydropower station has been planned. And the best one not only satisfies navigation demand, but also increases daily electricity generation.
引用
收藏
相关论文
共 50 条
  • [1] Research on a layered coupling optimal operation model of the Three Gorges and Gezhouba cascade hydropower stations
    Chen, Juan
    Zhong, Ping-an
    Zhao, Yun-fa
    ENERGY CONVERSION AND MANAGEMENT, 2014, 86 : 756 - 763
  • [2] Optimal short-term operation of a cascade of hydropower stations
    Wolf, AJ
    Lindberg, PO
    HYDRAULIC ENGINEERING SOFTWARE VI, 1996, : 215 - 221
  • [3] Discussion on the cascade dispatch and complex control of Three Gorges-Gezhouba hydropower plants
    Fang, Huiqin
    Dianli Xitong Zidonghue/Automation of Electric Power Systems, 2000, 24 (04):
  • [4] Application of immune particle swarm optimization algorithm to short-term optimal dispatch of cascade hydropower stations
    Wuhan University, Wuhan 430072, China
    不详
    不详
    Shuili Xuebao, 2008, 4 (426-432):
  • [5] Discussion on the short-term weekly optimal scheduling of cascade hydropower stations
    Li, Liang
    Zhou, Yun
    Huang, Qiang
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (04): : 38 - 42
  • [6] Short-term optimal operation of Three-gorge and Gezhouba cascade hydropower stations in non-flood season with operation rules from data mining
    Ma, Chao
    Lian, Jijian
    Wang, Junna
    ENERGY CONVERSION AND MANAGEMENT, 2013, 65 : 616 - 627
  • [7] Optimal operation rules of Three-gorge and Gezhouba cascade hydropower stations in flood season
    Mu, Jie
    Ma, Chao
    Zhao, Jiaqing
    Lian, Jijian
    ENERGY CONVERSION AND MANAGEMENT, 2015, 96 : 159 - 174
  • [8] Research on short-term optimization operation of cascade hydropower stations
    Xie, Hongsheng
    Wu, Xianglin
    Chen, Yang
    Zhao, Yong
    Ran, Guangcan
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2008, 27 (06): : 1 - 7
  • [9] Daily optimized model for long-term operation of the Three Gorges-Gezhouba Cascade Power Stations
    GuangJing Cao
    ZhiGuo Cai
    ZhiWu Liu
    GuangQian Wang
    Science in China Series E: Technological Sciences, 2007, 50 : 98 - 110
  • [10] Daily optimized model for long-term operation of the Three Gorges-Gezhouba Cascade Power Stations
    Cao GuangJing
    Cai ZhiGuo
    Liu ZhiWu
    Wang GuangQian
    SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2007, 50 (Suppl 1): : 98 - 110