A decomposition approach for integrated locomotive scheduling and driver assignment in rail freight transport

被引:0
|
作者
Baermann, Andreas [1 ]
Martin, Alexander [2 ]
Staszek, Jonasz [2 ]
机构
[1] Friedrich Alexander Univ Erlangen Nurnberg, Lehrstuhl Analyt & Mixed Integer Optimizat, Dept Data Sci, Dept Math, Cauerstr 11, D-91058 Erlangen, Germany
[2] Tech Univ Nurnberg, Analyt & Optimizat Lab, Ulmenstr 52, D-90544 Nurnberg, Germany
关键词
Integrated locomotive scheduling and driver; assignment; Railway transport; Integer programming; Decomposition; Cutting planes; BENDERS DECOMPOSITION; CREW; VEHICLE; BUS; CLIQUES; ROBUST; ALGORITHM; MODELS;
D O I
10.1016/j.ejtl.2024.100145
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this work, we consider the integrated problem of locomotive scheduling and driver assignment in rail freight companies. Our aim is to compute an optimal simultaneous assignment of locomotives and drivers to the trains listed in a given order-book. Mathematically, this leads to the combination of a set-packing problem with compatibility constraints and a multi-commodity-flow problem. We develop a binary-programming formulation to model the given task and improve it by performing a clique-based tightening of the original set-packing inequalities. The objective function of this model makes sure that as many trains as possible are running. To handle the computational complexity of the problem, we introduce a novel decomposition approach which decomposes the problem into a master locomotive scheduling problem and a subproblem for driver assignment. It exploits the fact that the master problem is empirically much easier to solve than the subproblem. For any fixed solution of the master problem, we can use the subproblem to either confirm feasibility of the master solution or to derive valid inequalities from various constraint classes to cut the infeasible master solution off and reiterate. To further improve solution times, we also develop a presolve heuristic. We demonstrate the potential of the presented method by solving a large-scale real-world problem instance provided by our industry partner DB Cargo Polska S.A., as well as a set of derived realistic instances.
引用
收藏
页数:29
相关论文
共 38 条
  • [21] A double-layered optimisation approach for the integrated due date assignment and scheduling problem
    Zhang, Rui
    Wu, Cheng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (01) : 5 - 22
  • [22] Integrated Airline Schedule Design and Fleet Assignment: Polyhedral Analysis and Benders' Decomposition Approach
    Sherali, Hanif D.
    Bae, Ki-Hwan
    Haouari, Mohamed
    INFORMS JOURNAL ON COMPUTING, 2010, 22 (04) : 500 - 513
  • [23] An agent-based simulation approach to investigate the shift of Switzerland's inland freight transport from road to rail
    Kaddoura, Ihab
    Masson, David
    Hettinger, Thomas
    Unterfinger, Merlin
    TRANSPORTATION, 2024, 51 (05) : 1701 - 1722
  • [24] Hybrid approach for the integrated scheduling of production and transport processes along supply chains
    Frazzon, Enzo Morosini
    Albrecht, Andre
    Pires, Matheus
    Israel, Eduardo
    Kueck, Mirko
    Freitag, Michael
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (05) : 2019 - 2035
  • [25] The Master Plan for rail transport in Croatia: An example of integrated methodological approach for the analysis of investment choices
    D'Alfonso, Salvatore
    Marcianò, Filippo Alessandro
    Nardoni, Silvia
    Ingegneria Ferroviaria, 2010, 65 (12): : 1079 - 1094
  • [26] A Novel Model and Decomposition Approach for the Integrated Airline Fleet Assignment, Aircraft Routing, and Crew Pairing Problem
    Shao, Shengzhi
    Sherali, Hanif D.
    Haouari, Mohamed
    TRANSPORTATION SCIENCE, 2017, 51 (01) : 233 - 249
  • [27] An Integrated CP-Based Approach for Scheduling of Processing and Transport Units in Pipeless Plants
    Zeballos, Luis J.
    Mendez, Carlos A.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2010, 49 (04) : 1799 - 1811
  • [28] Integrated Public Transport Timetable Synchronization and Vehicle Scheduling with Demand Assignment: A Bi-objective Bi-level Model Using Deficit Function Approach
    Liu, Tao
    Ceder, Avishai
    PAPERS SELECTED FOR THE 22ND INTERNATIONAL SYMPOSIUM ON TRANSPORTATION AND TRAFFIC THEORY, 2017, 23 : 341 - 361
  • [29] Integrated public transport timetable synchronization and vehicle scheduling with demand assignment: A bi-objective bi-level model using deficit function approach
    Liu, Tao
    Ceder, Avishai Avi
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 117 : 935 - 955
  • [30] Integrated optimization of rolling stock allocation and train timetables for urban rail transit networks: A benders decomposition approach
    Yin, Jiateng
    Pu, Fan
    Yang, Lixing
    D'Ariano, Andrea
    Wang, Zhouhong
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2023, 176