共 11 条
- [1] Li Z., Cao X., Organization and Management of Armament Repairing Institute, (2003)
- [2] Wang Z., Tan Y., A new solution to three-machine permutation flow-shop problem, Journal of Systems Engineering, 19, 6, pp. 577-614, (2004)
- [3] Wang Z., Cen K., Tan Y., Heuristic algorithm to permutation flow shop scheduling problem, Computer Integrated Manufacturing Systems, 10, 9, pp. 1124-1128, (2004)
- [4] Petra S., Approximating schedules, (2000)
- [5] David M., Marshall B., Sean M., Genetic algorithms for complex, real-time scheduling, (2005)
- [6] Roger C., Maintenance scheduling for mechanical equipment, (2005)
- [7] Roger C., Maintenance scheduling for electrical equipment, (2005)
- [8] Daniel F., Rina D., Maintenance scheduling problems as benchmarks for constraint algorithms, (2005)
- [9] Han B., Fan X., Ma D., Research on the optimal preventive maintenance policy based on reliablility constraints, Chinese Journal of Mechanical Engineering, 39, 6, pp. 102-105, (2003)
- [10] Han B., Fan X., Ma D., Optimization of equipment preventive maintenance cycle in production system based on genetic algorithm, Computer Integrated Manufacturing Systems, 9, 3, pp. 122-125, (2003)