Component-based mission planning modeling and solution to intelligent satellite

被引:0
作者
Zhang, Xue-Ting [1 ]
Xing, Li-Ning [1 ]
Chen, Ying-Wu [1 ]
Zhu, Jian-Bing [2 ]
机构
[1] College of Information System and Management, National University of Defense Technology, Changsha
[2] General Department, China Academy of Space Technology, Beijing
来源
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS | 2014年 / 20卷 / 12期
基金
中国国家自然科学基金;
关键词
Component-based; Heuristics; Intelligent satellite; Mission planning; Time window clipping;
D O I
10.13196/j.cims.2014.12.004
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
To solve the defects and deficiencies of current algorithms with less generality and incomplete constraints, the software architecture of mission planning was designed with 7 sorting strategies, 8 time window selection strategies and 8 sub-function components. By using time window clipping algorithm, different kinds of time window overlap were considered to avoid conflicts and ensure the back-operation activities after observation. Such component-based modular heuristic methods could achieve autonomous mission planning system in the future. ©, 2014, CIMS. All right reserved.
引用
收藏
页码:2944 / 2951
页数:7
相关论文
共 20 条
[1]  
Smith D.E., Frank J., Jonsson A.K., Bridging the gap between planning and scheduling, Knowledge Engineering Review, 15, 1, pp. 15-18, (2000)
[2]  
Li Z., The present development situation and prospects of spacecraft intelligent autonomous control technology, Aerospace Control, 20, 4, pp. 1-7, (2002)
[3]  
Ma Y., Yu X., Yin Z., The modern small satellite technology and development measures, Basic Defense Technology, 5, pp. 13-15, (2003)
[4]  
Schetter T., Campbell M., Surka D., Multiple agent-based autonomy for satellite constellations, Artificial Intelligence, 145, 1, pp. 147-180, (2003)
[5]  
Wang P., Tan Y., The mission planning problem for earth observing satellites concise review, Computer Research and Application, 25, 10, pp. 2893-2897, (2008)
[6]  
Fratiini S., Cesta A., The APSI framework: A platform for timeline synthesis, Proceedings of the Workshop on Planning and Scheduling with Timelines, pp. 8-15, (2012)
[7]  
Verfaillie G., Pralet C., How to model planning and scheduling problems using timelines, The Knowledge Engineering Review, 25, 3, pp. 319-336, (2010)
[8]  
Xing L.N., Rohlfshagen P., Chen Y.W., Et al., An evolutionary approach to the multi-depot capaciated are routing problem, IEEE Transaction on Evolutionary Computation, 14, 3, pp. 356-374, (2010)
[9]  
Grasset-Bourdel R., Verfaillie G., Planning and replanning for a constellation of agile earth observation satellites, Proceedings of the 21th International Conference on Automated Planning and Scheduling, (2011)
[10]  
Pemberton J.C., Greenwald L.G., On the need for dynamic scheduling of imaging satellites, International Archives of Photogrammetry Remote Sensing and Spatial Information Sciences, 34, 1, pp. 165-171, (2002)