Objective increment based metaheuristic for total flowtime minimization in no-wait flowshops

被引:0
|
作者
School of Computer Science and Engineering, Southeast University, Nanjing 210096, China [1 ]
机构
来源
J. Southeast Univ. Engl. Ed. | 2008年 / 2卷 / 168-173期
关键词
23;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:168 / 173
相关论文
共 50 条
  • [41] Multi-objective particle swarm optimization algorithm for scheduling in flowshops to minimize makespan, total flowtime and completion time variance
    Chandrasekaran, S.
    Ponnambalam, S. G.
    Suresh, R. K.
    Vijayakumar, N.
    2007 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-10, PROCEEDINGS, 2007, : 4012 - +
  • [42] Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm
    Lin, Shih-Wei
    Ying, Kuo-Ching
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (06) : 1625 - 1647
  • [43] The no-wait job shop with regular objective: a method based on optimal job insertion
    Reinhard Bürgy
    Heinz Gröflin
    Journal of Combinatorial Optimization, 2017, 33 : 977 - 1010
  • [44] Total flow time minimization in no-wait job shop using a hybrid discrete group search optimizer
    Deng, Guanlong
    Zhang, Zhiwang
    Jiang, Tianhua
    Zhang, Shuning
    APPLIED SOFT COMPUTING, 2019, 81
  • [45] The no-wait job shop with regular objective: a method based on optimal job insertion
    Burgy, Reinhard
    Groflin, Heinz
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2017, 33 (03) : 977 - 1010
  • [46] Fast local neighborhood search algorithm for the no-wait flow shop scheduling with total flow time minimization
    Qi, Xuemei
    Wang, Hongtao
    Zhu, Haihong
    Zhang, Ji
    Chen, Fulong
    Yang, Jie
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4957 - 4972
  • [47] An energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption
    Yuksel, Damla
    Tasgetiren, M. Fatih
    Kandiller, Levent
    Gao, Liang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 145
  • [48] A new hybrid genetic algorithm for the bi-criteria no-wait flowshop scheduling problem with makespan and total flow time minimization
    Liu, You-Gen
    Zhu, Xia
    Li, Xiao-Ping
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 883 - +
  • [49] Multi-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution
    Bin Qian
    Ling Wang
    De-Xian Huang
    Xiong Wang
    Soft Computing, 2009, 13 : 847 - 869
  • [50] Multi-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution
    Qian, Bin
    Wang, Ling
    Huang, De-Xian
    Wang, Xiong
    SOFT COMPUTING, 2009, 13 (8-9) : 847 - 869