共 50 条
- [1] The Application of Double Load Cells Self-balanced Method on the Static Load Test of Long Post-Grouting Pile with Great Diameter 2014 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA), 2014, : 765 - 768
- [2] Analysis on pile testing results of post-grouting bored pile 3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
- [3] Post-grouting bored pile technology 3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
- [4] Numerical analysis on the bearing capacity of post-grouting bored pile under vertical load Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2006, 40 (12): : 2122 - 2125
- [5] Pile Load Test of Post-grouting Bored Pile at Beijing Capital International Airport 2019 3RD INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2019), 2019, 267
- [6] Application and Construction Technology of Post-Grouting Bored Pile PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 737 - 740
- [7] Experiment research on bored pile with post-grouting technology CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 854 - 857
- [8] Research on the pile-base post-grouting enhancement effect of bored pile Shi, M. (mingleish@163.com), 1600, China University of Mining and Technology (43): : 144 - 150
- [9] Research on Bearing Capacity of Post-grouting Super-long Bored Pile 2020 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ENVIRONMENT RESOURCES AND ENERGY MATERIALS, 2021, 634
- [10] The behavior of post-grouting pile groups under vertical load SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1: ELEVENTH ASIAN REGIONAL CONFERENCE, 1999, : 209 - 212