Causes and effects of delays in Malaysian construction industry

被引:650
作者
Sambasivan, Murali [1 ]
Soon, Yau Wen [1 ]
机构
[1] Graduate School of Management, Universiti Putra Malaysia
关键词
Construction industry; Correlational analysis; Delay causes; Delay effects; Malaysia;
D O I
10.1016/j.ijproman.2006.11.007
中图分类号
学科分类号
摘要
The problem of delays in the construction industry is a global phenomenon and the construction industry in Malaysia is no exception. The main purpose of this study is to identify the delay factors and their impact (effect) on project completion. Earlier studies either considered the causes or the effects of project delays, separately. This study takes an integrated approach and attempts to analyze the impact of specific causes on specific effects. A questionnaire survey was conducted to solicit the causes and effects of delay from clients, consultants, and contractors. About 150 respondents participated in the survey. This study identified 10 most important causes of delay from a list of 28 different causes and 6 different effects of delay. Ten most important causes were: (1) contractor's improper planning, (2) contractor's poor site management, (3) inadequate contractor experience, (4) inadequate client's finance and payments for completed work, (5) problems with subcontractors, (6) shortage in material, (7) labor supply, (8) equipment availability and failure, (9) lack of communication between parties, and (10) mistakes during the construction stage. Six main effects of delay were: (1) time overrun, (2) cost overrun, (3) disputes, (4) arbitration, (5) litigation, and (6) total abandonment. This study has also established an empirical relationship between each cause and effect. © 2006 Elsevier Ltd and IPMA.
引用
收藏
页码:517 / 526
页数:9
相关论文
共 18 条
[1]  
Aibinu A.A., Jagboro G.O., The effects of construction delays on project delivery in Nigerian construction industry, Int J Project Manage, 20, pp. 593-599, (2002)
[2]  
Ajanlekoko J.O., Controlling cost in the construction industry, Lagos QS Digest, Lagos, 1, 1, pp. 8-12, (1987)
[3]  
Alkass S., Mazerolle M., Harris F., Construction delay analysis techniques, Construction Manage Econ, 14, 5, pp. 375-394, (1996)
[4]  
Al-Momani A., Construction delay: a quantitative analysis, Int J Project Manage, 20, pp. 51-59, (2000)
[5]  
Assaf S.A., Al-Hejji S., Causes of delay in large construction projects, Int J Project Manage, 24, 4, pp. 349-357, (2006)
[6]  
Assaf S.A., Alkhalil M., Al-Hazmi M., Causes of delay in large building construction projects, J Manage Eng, ASCE, 11, 2, pp. 45-50, (1995)
[7]  
Chan D.W.M., Kumaraswamy M.M., A comparative study of causes of time overruns in Hong Kong construction projects, Int J Project Manage, 15, 1, pp. 55-63, (1997)
[8]  
Chan D.W.M., Kumaraswamy M.M., Compressing construction durations: lessons learned from Hong Kong building projects, Int J Project Manage, 20, pp. 23-35, (2002)
[9]  
Frimpong Y., Oluwoye J., Crawford L., Causes of delay and cost overruns in construction of groundwater projects in a developing countries
[10]  
Ghana as a case study, Int J Project Manage, 21, pp. 321-326, (2003)