Tubing failure in HP/HT wells investigated and mitigated

被引:0
|
作者
机构
来源
| 1600年 / Society of Petroleum Engineers (SPE)卷 / 73期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Conference article (CA)
引用
收藏
相关论文
共 50 条
  • [1] Using coiled tubing in HP/HT corrosive gas wells
    Larsen, H.A.
    Kenrick, Antony
    Bell, Robert
    1997, Society of Petroleum Engineers (SPE), Richardson, TX, United States (49):
  • [2] Using coiled tubing in HP/HT corrosive gas wells
    不详
    JOURNAL OF PETROLEUM TECHNOLOGY, 1997, 49 (06): : 620 - &
  • [3] Erskine field HP/HT workover and tubing failure investigation
    Mowat, DE
    Edgerton, MC
    Wade, EHR
    JOURNAL OF PETROLEUM TECHNOLOGY, 2001, 53 (03): : 68 - +
  • [4] Erskine field HP/HT workover and tubing failure investigation
    Mowat, D.E.
    Edgerton, M.C.
    Wade, E.H.R.
    1600, Society of Petroleum Engineers (SPE) (53): : 68 - 71
  • [5] Dynamic seals in HP/HT wells
    Shepherd, R
    Stevenson, A
    UNDERWATER TECHNOLOGY, 1996, 22 (01): : 15 - 20
  • [6] Dynamic seals in HP/HT wells
    Shepherd, R.
    Stevenson, A.
    Underwater Technology, 22 (01): : 15 - 20
  • [7] HP/HT wells in a subsea environment
    Grillo, P.
    Natarajan, S.
    Journal of Offshore Technology, 1997, 5 (04): : 11 - 13
  • [8] Drill ahead to complete HP/HT wells
    Anon
    Hart's E and P, 2001, 74 (09):
  • [9] Erskine field HP/HT workover and tubing failure investigation (vol 53, pg 68, 2001)
    Mowat, DE
    Edgerton, MC
    Wade, EHR
    JOURNAL OF PETROLEUM TECHNOLOGY, 2001, 53 (04): : 102 - 102
  • [10] Testing titanium-alloy tubing for HP/HT applications
    Gonzalez, Manuel
    Maskos, Krystian
    Hargrave, Robert
    Kuberry, John
    Reeves, Doyle
    Grauman, Jim
    Skogsberg, Jim
    Ali, Syed
    JPT, Journal of Petroleum Technology, 2009, 61 (06): : 41 - 42