Post-construction monitoring and analysis for highway tunnel lining cracks

被引:0
|
作者
Ye, Fei [1 ,2 ]
He, Chuan [1 ]
Xia, Yongxu [2 ]
机构
[1] Southwest Jiaotong University, Chengdu 610031, China
[2] Chang'an University, Xi'an 710064, China
关键词
Geology - Tunnel linings;
D O I
暂无
中图分类号
学科分类号
摘要
Lots of lining cracks have been found when a highway tunnel is open to traffic for only a short period of time. Investigation of the cracks was conducted to obtain the statistics, which includes the number, length, inclination, width, and depth of typical cracks. The causes for cracks occurrence were analyzed using the geological observation report during construction, construction recording, monitoring data, field investigation, and numerical analysis. Such factors as the geology, construction, uneven load and design were considered as the major causes of cracking. Concrete shrinkage and the 5.12 earthquake were also believed to have influenced the crack appearance. Some typical cracks were selected for monitoring the three-dimensional extension, depth development, length growth and increase of the cracks. Through analysis of the collected data, the load-bearing condition and safety of the tunnel lining were diagnosed and evaluated. It was believed that the tunnel lining was stable and safe, even with the cracks. Suggestions for crack treatment were presented.
引用
收藏
页码:97 / 104
相关论文
共 50 条
  • [1] Tunnel post-construction actions and stresses in the final lining
    Flor, AFT
    Santos-Pereira, C
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 309 - 314
  • [2] Cracks analysis of highway tunnel lining in flooded loess
    Liu, Yuyang
    Lai, Hongpeng
    Xie, Yongli
    Song, Weilong
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2017, 170 (01) : 62 - 72
  • [3] Post-Construction Monitoring of Rehabilitated Highway Embankment Slope in Texas
    Gajurel, Amit
    Chimauriya, Hiramani
    Biswas, Nripojyoti
    Boluk, Burak
    Congress, Surya Sarat Chandra
    Puppala, Anand J.
    GEO-CONGRESS 2023: GEOTECHNICAL SYSTEMS FROM PORE-SCALE TO CITY-SCALE, 2023, : 116 - 125
  • [4] Analysis of construction and post-construction settlement data caused by immersed tunnel
    Wei, G. (weig@zucc.edu.cn), 1600, Academia Sinica (32):
  • [5] Post-construction infield lining rehabs subsea pipelines
    Walters, Robert
    OIL & GAS JOURNAL, 2014, 112 (08) : 82 - 84
  • [6] 'Post-Construction'
    Ryan, K
    POETRY, 2002, 179 (04) : 193 - 193
  • [7] Analysis on Construction Monitoring Scheme of Highway Tunnel with Small Spacing
    Gong, Jianwu
    Qi, Peilin
    Wen, Bingyan
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, 2015, 23 : 588 - 591
  • [8] Analysis and discussion on post-construction settlement of soft soil foundation treatment test section of highway
    Zhang, M.
    Li, J. J.
    Qin, Ch K.
    2ND INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, ENERGY TECHNOLOGY AND ENVIRONMENTAL ENGINEERING (MSETEE 2017), 2017, 81
  • [9] Post-construction interviews
    Ehmke, Greg
    PCI JOURNAL, 2007, 52 (01): : 27 - 27
  • [10] Analysis and Study on Crack Characteristics of Highway Tunnel Lining
    Zhang, Nian
    Zhu, Xuejian
    Ren, Yifan
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (05): : 1119 - 1123