Prediction method of tunnel deformation using time-dependent ground deterioration model

被引:12
作者
Shimamoto, Keisuke [1 ]
Yashiro, Kazuhide [1 ]
Kojima, Yoshiyuki [1 ]
Asakura, Toshihiro [2 ]
机构
[1] Tunnel Laboratory, Structure Technology Division
[2] Kyoto University, Graduate School of Engineering
来源
Quarterly Report of RTRI (Railway Technical Research Institute) (Japan) | 2009年 / 50卷 / 02期
关键词
Deformation; Earth pressure; Numerical analysis; Prediction; Tunnel;
D O I
10.2219/rtriqr.50.81
中图分类号
学科分类号
摘要
Some mountain tunnels suffer from deformation and cracks caused by earth pressure, and such damage can progress with the passage of time for some tunnels. Due the unknown variables involved in the time-dependent deformation and destruction behavior of such tunnels, no maintenance management method has yet been established. In this study, we focused on tunnel deformation caused by earth pressure, and attempted to apply numerical analysis to the situation. As the result of the study, we achieved simulation of the behavior of tunnel deformation as time progressed and demonstrated the applicability of determination for appropriate timing and countermeasure types.
引用
收藏
页码:81 / 88
页数:7
相关论文
共 2 条
[1]  
Nozawa S., Ito T., Et al., Kisetu Tonnel no Bouatsu wo Kokuhuku,, Tunnels and Underground, (1992)
[2]  
Jiang Y., Ezaki T., Et al., Quantitative Analysis of the Ground Characteristic Curve in Tunneling, Proceedings of the Japan Symposium on Rock Mechanics, 9, pp. 767-772, (1994)