共 50 条
- [1] Study on influence of excavation sequence on the stability of coal pillar under final highwall with auger mining PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1664 - 1669
- [5] Influence mechanism of pillar-side backfilling on the overburden-coal pillar system's stability under upward mining MATERIALS TODAY COMMUNICATIONS, 2025, 44
- [6] Short Wall Box Style Mining Method of Strip Coal Pillar under Town FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE II, PTS 1-6, 2012, 121-126 : 4146 - +
- [9] Coal Pillar Stability Investigation for High-Intensity Mining in the Water-Rich Coal Seam: A Case Study Mining, Metallurgy & Exploration, 2024, 41 : 743 - 768