共 50 条
[41]
Injection of solid biomass products into the blast furnace and its potential effects on an integrated steel plant
[J].
INTERNATIONAL CONFERENCE ON APPLIED ENERGY, ICAE2014,
2014, 61
:2184-2187
[42]
Campaigns and relines of blast furnace no 1 at the Oita steelworks of Nippon Steel Corp
[J].
STAHL UND EISEN,
1996, 116 (12)
:83-&
[43]
MADELINE GOES COLD OR FREEZE-UP AND RECOVERY OF INLANDS NO. 1 BLAST FURNACE
[J].
BLAST FURNACE AND STEEL PLANT,
1970, 58 (07)
:476-&
[45]
SUMMARY OF THE SECOND TEST ON REGULAR LAYER FILLING IN BLAST FURNACE No. 3 OF WUHAN IRON AND STEEL COMPANY.
[J].
Kang T'ieh/Iron and Steel (Peking),
1983, 18 (01)
:1-6
[47]
Shell strength analysis by finite element method for No. 11 blast furnace at Anshan Iron and Steel Co.
[J].
Kang T'ieh/Iron and Steel (Peking),
1992, 27 (05)
:6-9
[48]
Improvement in relining design of No.1 blast furnace at Baoshan Iron and Steel Corp
[J].
Kang T'ieh/Iron and Steel (Peking),
1998, 33 (03)
:1-4
[49]
Charging apparatus with a revolving distributor: Five years of successful operation on blast furnace No. 3 at the Bhilai Metallurgical Plant
[J].
Metallurg,
2005, (12)
:33-41