Fault analysis on 500 kV disconnected switch operation in Shanghe Substation

被引:0
|
作者
Xie, Xue-Wu
Shen, Lian
机构
来源
Zhongguo Dianli/Electric Power | 2002年 / 35卷 / 05期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Reconstruction of the 500 kV substation integrated automation system in operation
    Huo, Jian-Bin
    Wu, Guo-Pei
    Huang, Xin
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (06): : 133 - 136
  • [2] ADVANCED OPERATION GUIDANCE-SYSTEM FOR 500 KV SUBSTATION
    ITO, S
    HATA, I
    HASEGAWA, T
    AMANO, M
    MARUYAMA, A
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1992, 14 (2-3) : 114 - 121
  • [3] ELECTROMAGNETIC INTERFERENCE ANALYSIS IN 500 KV SUBSTATION
    Shen, Xin
    Cao, Min
    Li, Xiao-Jiang
    ENERGY AND MECHANICAL ENGINEERING, 2016, : 435 - 442
  • [4] Fracture failure analysis of conductive arm spring of isolation switch in 500kV substation
    Wang, Jun
    Liu, Yungen
    Chen, Junjun
    Huang, Rong
    Cao, Xianhui
    Feng, Chao
    2020 5TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY AND ENVIRONMENTAL PROTECTION, 2020, 621
  • [5] Effectiveness Analysis of Primary and Secondary Protective Measures for 500 kV Substation Switch Transient Field
    Wang Li
    Zhao Hui
    Luo Zhengbang
    Yu Yongyang
    Liu Ximin
    Xie Yutong
    PROCEEDINGS FIRST INTERNATIONAL CONFERENCE ON ELECTRONICS INSTRUMENTATION & INFORMATION SYSTEMS (EIIS 2017), 2017, : 372 - 375
  • [6] An application of expert system to equipment operation of 500kv substation
    Deng, YH
    Zhang, BM
    Yang, YH
    PROCEEDINGS OF THE 3RD WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-5, 2000, : 220 - 224
  • [7] Fault analysis of 110 kV substation PT
    Jiang, Jiang
    Zhang, Fugang
    Fan, Yuefu
    Liu, Fang
    Liu, Kai
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2010, 30 (10): : 139 - 140
  • [8] Analysis on lightning overvoltage of 500kV substation
    Shao Yu
    Shao Ming
    Shi Feng
    Wang Kun
    MECHATRONICS, ROBOTICS AND AUTOMATION, PTS 1-3, 2013, 373-375 : 1541 - 1545
  • [9] Analysis Report of A Phase CVT Fault in 220kV Auxiliary Section I of 500kV Substation
    Yu Bing
    Yang Zhi
    Zhou Luyao
    Zhao Lin
    Lin Haofan
    Yang Yong
    2021 THE 6TH INTERNATIONAL CONFERENCE ON INTEGRATED CIRCUITS AND MICROSYSTEMS (ICICM 2021), 2021, : 376 - 379
  • [10] Safe Distance of Inspection Operation by Unmanned Aerial Vehicles in 500 kV Substation
    Cai, Huanqing
    Fu, Jing
    Yang, Ning
    Shao, Guiwei
    Wen, Zhike
    Tan, Jiaying
    Gaodianya Jishu/High Voltage Engineering, 2024, 50 (07): : 3199 - 3208