共 11 条
[1]
Hu N., Dai G.L., Yan B., Et al., Recent development of design and construction of medium and long span high-speed railway bridges in China, Engineering Structures, 74, pp. 233-241, (2014)
[2]
Liu R., Ji B.H., Wang M.M., Et al., Numerical evaluation of toe-deck fatigue in orthotropic steel bridge deck, Journal of Performance of Constructed Facilities, 29, 6, (2015)
[3]
Ya S., Yamada K., Ishikawa T., Fatigue evaluation of rib-to-deck welded joints of orthotropic steel bridge deck, Journal of Bridge Engineering, 16, 4, pp. 492-499, (2011)
[4]
Wei X., Zou X., Jiang S., Et al., Numerical simulation of residual stress in rib-to-top plate welding of orthotropic steel bridge deck, Bridge Construction, 44, 4, pp. 27-33, (2014)
[5]
Cao B., Ding Y., Influence analysis of plate thickness on welding residual stress of steel deck deck-rib, Journal of Southeast University (Natural Science Edition), 46, 3, pp. 565-571, (2016)
[6]
Cui C., Bu Y.Z., Bao Y., Et al., Strain energy-based fatigue life evaluation of deck-to-rib welded joints in OSD considering combined effects of stochastic traffic load and welded residual stress, Journal of Bridge Engineering, 23, 2, (2018)
[7]
Zhao Q., Wu C., Numerical analysis of welding residual stress of u-rib stiffened plate, Engineering Mechanics, 29, 8, pp. 262-268, (2012)
[8]
Chen S.J., Yang K.C., Inelastic behavior of orthotropic steel deck stiffened by U-shaped stiffeners, Thin-Walled Structures, 40, 6, pp. 537-553, (2002)
[9]
Tong L., Zhao J., Zhou F., Et al., Experimental investigation on longitudinal residual stress of Q460 high-strength steel welded H-section members, Industrial Construction, 42, 1, pp. 51-55, (2012)
[10]
Wei J., Wang D., Liu X., Et al., Computer simulation of welding residual stress in steel girder bridge, Bridge Construction, 45, 4, pp. 94-99, (2015)