共 37 条
- [1] Nahavandi N., Zegordi S., Abbasian M., Solving the dynamic job shop scheduling problem using bottleneck and intelligent agents based on genetic algorithm, International Journal of Engineering-Transactions C: Aspects, 29, 3, pp. 347-352, (2016)
- [2] Hamta N., Ghomi S.F., Bahalke U., Golpaigani H., Single machine scheduling problem with precedence constraints and deteriorating jobs, International Journal of Engineering-Transactions A: Basics, 24, 2, pp. 115-122, (2011)
- [3] Chen Z.-L., Integrated production and outbound distribution scheduling: Review and extensions, Operations Research, 58, 1, pp. 130-148, (2010)
- [4] Vroblefski M., Ramesh R., Zionts S., Efficient lot-sizing under a differential transportation cost structure for serially distributed warehouses, European Journal of Operational Research, 127, 3, pp. 574-593, (2000)
- [5] Gao S., Qi L., Lei L., Integrated batch production and distribution scheduling with limited vehicle capacity, International Journal of Production Economics, 160, pp. 13-25, (2015)
- [6] Yin Y., Cheng T., Hsu C.-J., Wu C.-C., Single-machine batch delivery scheduling with an assignable common due window, Omega, 41, 2, pp. 216-225, (2013)
- [7] Rasti-Barzoki M., Hejazi S.R., Minimizing the weighted number of tardy jobs with due date assignment and capacityconstrained deliveries for multiple customers in supply chains, European Journal of Operational Research, 228, 2, pp. 345-357, (2013)
- [8] Rasti-Barzoki M., Hejazi S.R., Pseudo-polynomial dynamic programming for an integrated due date assignment, resource allocation, production, and distribution scheduling model in supply chain scheduling, Applied Mathematical Modelling, 39, 12, pp. 3280-3289, (2015)
- [9] Mazdeh M.M., Shashaani S., Ashouri A., Hindi K.S., Single-machine batch scheduling minimizing weighted flow times and delivery costs, Applied Mathematical Modelling, 35, 1, pp. 563-570, (2011)
- [10] Zhong X., Jiang D., Integrated scheduling of production and distribution with release dates and capacitated deliveries, Mathematical Problems in Engineering, 2016, (2016)