共 13 条
[1]
Fiorentini L., Marmo L., Danzi E., L'Analisi del Rischio di Incendio per Gli Occupanti e per la Proprietà Alla Luce dei Recenti Atti Normativi e delle Esperienze e Metodologie Internazionali, (2016)
[2]
Fiorentini L., Marmo L., Danzi E., A parametric fire risk assessment method supporting performance based approaches, 2017 SFPE Middle East Conference: Getting-it-right Tools and Strategies to Improve Fire Protection Engineering on Projects, (2017)
[3]
Fiorentini L., Marmo L., Danzi E., Puccia V., Fire risk assessment of photovoltaic plants. A case study moving from two large fires: From accident investigation and forensic engineering to fire risk assessment for reconstruction and permitting purposes, Chem. Eng. Trans., 48, pp. 427-432, (2016)
[4]
TECHNICAL REPORT ISO/lEC TR. Fire-safety Engineering - Technical Information on Methods for Evaluating Behaviour and Movement of People, (2010)
[5]
Karlsson B., Quintiere J., Enclosure Fire Dynamics, (1999)
[6]
Marchant R., Some discussions on egress calculation-time to move, International Journal on Engineering Performance-based Fire Codes, 1, pp. 81-95, (1999)
[7]
Marmo L., Fiorentini L., Piccinini N., Fire risk in historical buildings. The case study of the arson of a Savoy residence during restoration works, 11th International Conference and Exhibition on Fire and Materials 2009, (2009)
[8]
Marmo L., Piccinini N., Fiorentini L., The Thyssen Krupp accident in Torino: Investigation methods, accident dynamics and lesson learned, Chemical Engineering Transactions. Italian Association of Chemical Engineering - AIDIC, pp. 615-620, (2012)
[9]
Marmo L., Piccinini N., Fiorentini L., Missing safety measures led to the jet fire and seven deaths at a steel plant in Turin. Dynamics and lessons learned, J. Loss Prev. Process Ind., 26, pp. 215-224, (2013)
[10]
Marmo L., Piccinini N., Russo G., Russo P., Munaro L., Multiple tank explosions in an edible-oil refinery plant: A case study, Chem. Eng. & Tech., 36, 7, pp. 1131-1137, (2013)