Optimization of construction ventilation scheme for large-scale underground cavern group of Xiangjiaba hydropower station based on numerical simulation

被引:0
|
作者
Li, Yan-Ling [1 ,2 ]
Yin, Qiang [3 ]
Mo, Zheng-Yu [1 ,2 ]
Tang, Cong-Zheng [3 ]
Chen, Xin [1 ,2 ]
Yang, Xing-Guo [1 ,2 ]
机构
[1] School of Water Resource and Hydropower, Sichuan Univ., Chengdu 610065, China
[2] State Key Lab. of Hydraulics and Mountain River Eng., Sichuan Univ., Chengdu 610065, China
[3] Sinohydro Eng. and Construction Bureau No.7 Co., Ltd., Chengdu 610081, China
来源
Sichuan Daxue Xuebao (Gongcheng Kexue Ban)/Journal of Sichuan University (Engineering Science Edition) | 2010年 / 42卷 / 04期
关键词
Hydroelectric power plants - Numerical models - Hydroelectric power - Tunnels;
D O I
暂无
中图分类号
学科分类号
摘要
The ventilation of Xiangjiaba underground powerhouse is very difficult, and the traditional ventilation design maybe result in poor effect and resource waste. In order to resolve these problems, the optimization model of ventilation scheme was proposed based on dynamic simulation and numerical simulation. By this model, the variability and the dynamic characteristic of needed wind quantity can be considered and the flow field can be simulated. The results showed that this method can provide the theoretic proof and technical support for the ventilation design.
引用
收藏
页码:1 / 6
相关论文
共 50 条
  • [1] Study on dynamic stability of large-scale underground cavern group during construction period of hydropower station
    Nie, Weiping
    Shi, Chong
    MECHANICAL ENGINEERING AND MATERIALS, PTS 1-3, 2012, 152-154 : 820 - +
  • [2] Numerical Simulation of Ventilation Performance for Large-scale Underground Cavern Group Considering Effect of Ventilation Shaft Structure
    Yimin Xia
    Xuemeng Xiao
    Yazhou Zhang
    Shuying Wang
    Laikuang Lin
    Arabian Journal for Science and Engineering, 2022, 47 : 4093 - 4104
  • [3] Numerical Simulation of Ventilation Performance for Large-scale Underground Cavern Group Considering Effect of Ventilation Shaft Structure
    Xia, Yimin
    Xiao, Xuemeng
    Zhang, Yazhou
    Wang, Shuying
    Lin, Laikuang
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (04) : 4093 - 4104
  • [4] Numerical analysis of the long-term stability of large-scale underground cavern of hydropower station
    Jiang Yu-zhou
    Xu Wei-ya
    Wang Rui-hong
    Wang Wei
    ROCK AND SOIL MECHANICS, 2008, 29 : 52 - 58
  • [5] Construction and monitoring study of large underground powerhouse caverns of Xiangjiaba Hydropower Station
    Fan, Qixiang
    Liu, Yiyong
    Wang, Yi
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (04): : 666 - 676
  • [6] Optimization Scheme for Construction Ventilation in Large-Scale Underground Oil Storage Caverns
    Zhang, Heng
    Sun, Jianchun
    Lin, Fang
    Chen, Shougen
    Yang, Jiasong
    APPLIED SCIENCES-BASEL, 2018, 8 (10):
  • [7] Characteristics of radon transport and optimization of ventilation parameters in large-scale underground cavern
    Li, Lingyu
    Zhang, Chuanqing
    Yang, Fanjie
    Fang, Zhi
    JOURNAL OF ENVIRONMENTAL RADIOACTIVITY, 2025, 281
  • [8] Reasonable Paths of Construction Ventilation for Large-Scale Underground Cavern Groups in Winter and Summer
    Sun, Jianchun
    Zhang, Heng
    Huang, Muyan
    Chen, Qianyang
    Chen, Shougen
    SUSTAINABILITY, 2018, 10 (10)
  • [9] Optimization of numerical method for excavating scheme for large underground cavern
    Duan, Ya-Gang
    Journal of Railway Engineering Society, 2013, 30 (08) : 83 - 87
  • [10] Seismic shaking table test for large-scale underground cavern group (II): Test scheme
    Liu Xiao-min
    Sheng Qian
    Chen Jian
    Ke Wen-hui
    Yang Ji-hua
    ROCK AND SOIL MECHANICS, 2015, 36 (06) : 1683 - 1690