共 50 条
- [41] Two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage J. Harbin Inst. Technol., 2008, 5 (674-678):
- [43] Two meta-heuristics for solving a new two-machine flowshop scheduling problem with the learning effect and dynamic arrivals The International Journal of Advanced Manufacturing Technology, 2013, 65 : 771 - 786
- [44] Two meta-heuristics for solving a new two-machine flowshop scheduling problem with the learning effect and dynamic arrivals INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 65 (5-8): : 771 - 786
- [45] Proposal of a new conception of an elastic neural network and its application to the solution of a two-dimensional travelling salesman problem Adaptive and Natural Computing Algorithms, Pt 2, 2007, 4432 : 80 - 87
- [48] Proposal of a switched-mode power supply employing a quadratic boost converter and a new topology of soft-switched two-switch forward converter APEC 2004: NINETEENTH ANNUAL IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION, VOLS 1-3, 2004, : 1384 - 1388
- [50] A New Two-objective Single Machine Scheduling Problem Considers a Past-sequence-dependent Setup Time and Learning Effect PROCEEDINGS OF THE 2018 1ST IEEE INTERNATIONAL CONFERENCE ON KNOWLEDGE INNOVATION AND INVENTION (ICKII 2018), 2018, : 309 - 312