共 50 条
- [1] A new proposal to two-processor scheduling problem for SWITCH-less program nets IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2004, E87A (11): : 2859 - 2867
- [2] Performance evaluation of a two-processor scheduling method for acyclic SWITCH-less program nets IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2005, E88A (06): : 1502 - 1506
- [3] An optimal two-processor scheduling for a class of SWITCH-less program nets with combined OR-nodes IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2002, E85A (06): : 1274 - 1280
- [6] PARAdeg-processor scheduling for acyclic SWITCH-less program nets JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 1999, 336 (07): : 1135 - 1153
- [9] Optimal parallel algorithm for two-processor scheduling Proceedings of the Conference on High Performance Computing on the Information Superhighway, HPC Asia'97, 1997, : 220 - 223
- [10] Computation of minimum firing time for general self-cleaning SWITCH-less program nets IEICE Trans Fund Electron Commun Comput Sci, 6 (1072-1078):