An efficient genetic algorithm for setup time minimization in PCB assembly

被引:0
|
作者
机构
[1] García-Nájera, Abel
[2] Brizuela, Carlos A.
[3] Martínez-Pérez, Israel M.
来源
Brizuela, Carlos A. (cbrizuel@cicese.mx) | 1600年 / Springer London卷 / 77期
关键词
50;
D O I
暂无
中图分类号
学科分类号
摘要
Journal article (JA)
引用
收藏
页码:5 / 8
相关论文
共 50 条
  • [41] REDUCE ASSEMBLY TIME AND LOWER PCB COSTS
    不详
    ELECTRONIC ENGINEERING, 1972, 44 (536): : 20 - &
  • [42] A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
    Fattahi, Parviz
    Hosseini, Seyed Mohammad Hassan
    Jolai, Fariborz
    Tavakkoli-Moghaddam, Reza
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (01) : 119 - 134
  • [43] A data mining algorithm for monitoring PCB assembly quality
    Zhang, Feng
    Luk, Timwah
    IEEE TRANSACTIONS ON ELECTRONICS PACKAGING MANUFACTURING, 2007, 30 (04): : 299 - 305
  • [44] Grouping SMT PCB Assembly using FCM Algorithm
    KHLi SFLee CKLi and Dawei Lu Hong Kong Ins titute of Vocational EducationTs ing Yi CampusHong KongHong Kong Productivity CouncilHong KongDept of ElectronicInformation EngineeringThe Hong Kong Polytechnic Univers ityWarwick Manufacturing GroupUnivers ity of WarwickEnglandUnited Kingdom
    机电工程技术, 2002, (06) : 112 - 116
  • [45] Integrated Scheduling Algorithm with Setup Time
    Xie Zhiqiang
    Yang Jing
    Teng Yuzheng
    Lan Lan
    ADVANCED MATERIALS RESEARCH, 2011, 213 : 226 - +
  • [46] PCB layout design using a genetic algorithm
    Jain, S
    Gea, HC
    JOURNAL OF ELECTRONIC PACKAGING, 1996, 118 (01) : 11 - 15
  • [47] Simulation of mixed-model PCB assembly lines with group setup and bypass conveyors
    I. O. Yilmaz
    H.-O. Günther
    S. Jain
    The International Journal of Advanced Manufacturing Technology, 2009, 42 : 335 - 347
  • [48] Simulation of mixed-model PCB assembly lines with group setup and bypass conveyors
    Yilmaz, I. O.
    Guenther, H.-O.
    Jain, S.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 335 - 347
  • [49] Group sequencing a PCB assembly system via an expected sequence dependent setup heuristic
    Rossetti, MD
    Stanford, KJA
    COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (01) : 231 - 254
  • [50] Assembly time minimization of a particular placement machine
    Alkaya, Ali Fuat
    Duman, Ekrem
    APPLIED MATHEMATICS FOR SCIENCE AND ENGINEERING, 2007, : 383 - +