Empirical models of creep settlements of concrete-faced rockfill dam and their applications
被引:0
作者:
Li, Shou-Ju
论文数: 0引用数: 0
h-index: 0
机构:
State Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology, Dalian, Liaoning 116024, ChinaState Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology, Dalian, Liaoning 116024, China
Li, Shou-Ju
[1
]
Yu, Shen
论文数: 0引用数: 0
h-index: 0
机构:
State Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology, Dalian, Liaoning 116024, ChinaState Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology, Dalian, Liaoning 116024, China
Yu, Shen
[1
]
Zhang, Jun
论文数: 0引用数: 0
h-index: 0
机构:
Liaoning Pushihe Pumped Storage Company Limited, Dandong, Liaoning 118000, ChinaState Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology, Dalian, Liaoning 116024, China
Zhang, Jun
[2
]
Tian, Ze-Run
论文数: 0引用数: 0
h-index: 0
机构:
State Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology, Dalian, Liaoning 116024, ChinaState Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology, Dalian, Liaoning 116024, China
Tian, Ze-Run
[1
]
机构:
[1] State Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology, Dalian, Liaoning 116024, China
[2] Liaoning Pushihe Pumped Storage Company Limited, Dandong, Liaoning 118000, China
Rocks - Finite element method - Regression analysis - Rock mechanics - Concretes - Dams;
D O I:
暂无
中图分类号:
学科分类号:
摘要:
Based on the basic characteristics of Merchant, Bergers and Butterfield creep models, three kinds of empirical models for predicting creep settlements of concrete-faced rockfill dam are proposed. Taking Pushihe concrete-faced rockfill dam for example, the sequential placement processes of concrete-faced rockfill dam are simulated by using nonlinear finite element method. The empirical model parameters are determined by using regression analysis procedure according to observed data of creep settlements in-situ. The relationships between creep settlements and times are presented. The engineering practical applications show that the fitting settlements agree well with observed values. The creep settlements of concrete-faced rockfill dam are related to not only times, but also stress state, location and elastic modulus of observing points.