A three-dimensional project portfolio management framework for construction companies

被引:0
|
作者
Wu Y. [1 ]
Zhang H. [1 ]
Xu H. [1 ]
机构
[1] North China Electric Power University, Beijing
来源
Open Civil Engineering Journal | 2016年 / 10卷
基金
中国国家自然科学基金;
关键词
Construction project management; Management practice; Project portfolio management; Three-dimensional framework;
D O I
10.2174/1874149501610010433
中图分类号
学科分类号
摘要
Many construction companies struggle with multi-project optimization and change despite adhering to normative project portfolio management instructions and best practices. One explanation is that managers lack extensive multi-project management experience from which to apply related theory to practical outcomes. This paper proposes a three-dimensional segmentation framework to guide companies with no prior project portfolio management experience in establishing a project portfolio management system and applying it to their situation. The framework decomposes an expansive and disorganized multi-projects group into a set of simple activities from three different dimensions (project type, project phase, and the management layer) to facilitate the introduction of project portfolio management theory and principles. Then, a case study illustrates the application and utility of the proposed framework. Although this framework was initially developed for a Chinese electric power construction company, it can also be applied to other construction companies in similar circumstances worldwide. © Wu et al.
引用
收藏
页码:433 / 447
页数:14
相关论文
共 50 条
  • [41] A framework for three-dimensional simulation of morphogenesis
    Cickovski, TM
    Huang, CB
    Chaturvedi, R
    Glimm, T
    Hentschel, HGE
    Alber, MS
    Glazier, JA
    Newman, SA
    Izaguirre, JA
    IEEE-ACM TRANSACTIONS ON COMPUTATIONAL BIOLOGY AND BIOINFORMATICS, 2005, 2 (04) : 273 - 288
  • [42] Ferromagnetism of three-dimensional graphene framework
    Qin, Sai
    Sun, Pingping
    Di, Qitao
    Zhou, Shuang
    Yang, Caiping
    Xu, Qingyu
    RSC ADVANCES, 2015, 5 (113): : 92899 - 92904
  • [43] A framework for three-dimensional navigation research
    Jeffery, Kathryn J.
    Jovalekic, Aleksandar
    Verriotis, Madeleine
    Hayman, Robin
    BEHAVIORAL AND BRAIN SCIENCES, 2013, 36 (05) : 571 - 587
  • [44] Three-dimensional incident management
    Goucher W.
    Computer Fraud and Security, 2010, 2010 (02): : 16 - 17
  • [45] Automatic construction of three-dimensional virtual urban models: Towards three-dimensional maps
    Shinya, Mikio
    Uemoto, Naoko
    Miyagawa, Isao
    Horiguchi, Shoichi
    Minamida, Kouki
    NTT R and D, 2000, 49 (01): : 11 - 18
  • [46] Maturity of Project Management in Construction Companies with the Use of Fuzzy Numbers
    Klaus-Rosinska, Agata
    Kuchta, Dorota
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2016 (ICNAAM-2016), 2017, 1863
  • [47] A three-dimensional framework for multi-tier sustainable supply chain management
    Sauer, Philipp C.
    Seuring, Stefan
    SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2018, 23 (06) : 560 - 572
  • [48] The visible animal project:: A three-dimensional, digital database for high quality three-dimensional reconstructions
    Böttcher, P
    Maierl, J
    Schiemann, T
    Glaser, C
    Weller, R
    Hoehne, KH
    Reiser, M
    Liebich, HG
    VETERINARY RADIOLOGY & ULTRASOUND, 1999, 40 (06) : 611 - 616
  • [49] Project portfolio management
    不详
    RESEARCH-TECHNOLOGY MANAGEMENT, 2003, 46 (02) : 63 - 64
  • [50] Study on Project Portfolio Management Organization Maturity for Major Construction Enterprise
    Guo Na
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 507 - 511