A three-dimensional project portfolio management framework for construction companies

被引:0
|
作者
Wu Y. [1 ]
Zhang H. [1 ]
Xu H. [1 ]
机构
[1] North China Electric Power University, Beijing
来源
Open Civil Engineering Journal | 2016年 / 10卷
基金
中国国家自然科学基金;
关键词
Construction project management; Management practice; Project portfolio management; Three-dimensional framework;
D O I
10.2174/1874149501610010433
中图分类号
学科分类号
摘要
Many construction companies struggle with multi-project optimization and change despite adhering to normative project portfolio management instructions and best practices. One explanation is that managers lack extensive multi-project management experience from which to apply related theory to practical outcomes. This paper proposes a three-dimensional segmentation framework to guide companies with no prior project portfolio management experience in establishing a project portfolio management system and applying it to their situation. The framework decomposes an expansive and disorganized multi-projects group into a set of simple activities from three different dimensions (project type, project phase, and the management layer) to facilitate the introduction of project portfolio management theory and principles. Then, a case study illustrates the application and utility of the proposed framework. Although this framework was initially developed for a Chinese electric power construction company, it can also be applied to other construction companies in similar circumstances worldwide. © Wu et al.
引用
收藏
页码:433 / 447
页数:14
相关论文
共 50 条
  • [21] Project and knowledge management at European public space agencies: The need for a three-dimensional project management office
    Cocchiara, Chiara Maria
    Lo Nigro, Giovanna
    Roma, Paolo
    Ragusa, Antonio
    SPACE POLICY, 2024, 70
  • [22] The three roles of a project portfolio management office: Their impact on portfolio management execution and success
    Unger, Barbara Natalie
    Gemuenden, Hans Georg
    Aubry, Monique
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (05) : 608 - 620
  • [23] APPLICATION OF FUZZY CBR AND MODM APPROACHES IN THE PROJECT PORTFOLIO SELECTION IN CONSTRUCTION COMPANIES
    Abbasianjahromi, H. R.
    Rajaie, H.
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2013, 37 (C1) : 143 - 155
  • [24] Empirical Challenges in the Implementation of IT Portfolio Management: A Survey in Three Companies
    Lwakatare, Lucy Ellen
    Kuvaja, Pasi
    Haapasalo, Harri
    Tolonen, Arto
    ADVANCED INFORMATION SYSTEMS ENGINEERING, CAISE 2015, 2015, 9097 : 453 - 467
  • [25] Construction of a Three-dimensional Covalent Organic Framework via the Linker Exchange Strategy
    Cui Yumeng
    Miao Zhuang
    Liu Qi
    Jin Fenchun
    Zhai Yufeng
    Zhang Lingyan
    Wang Wenli
    Wang Ke
    Liu Guiyan
    Zeng Yongfei
    CHEMICAL RESEARCH IN CHINESE UNIVERSITIES, 2022, 38 (02) : 402 - 408
  • [26] Construction of a Three-dimensional Covalent Organic Framework via the Linker Exchange Strategy
    Yumeng Cui
    Zhuang Miao
    Qi Liu
    Fenchun Jin
    Yufeng Zhai
    Lingyan Zhang
    Wenli Wang
    Ke Wang
    Guiyan Liu
    Yongfei Zeng
    Chemical Research in Chinese Universities, 2022, 38 : 402 - 408
  • [27] The construction of optimum three-dimensional shapes within the framework of a model of local interaction
    Yakunina, GY
    PMM JOURNAL OF APPLIED MATHEMATICS AND MECHANICS, 2000, 64 (02): : 289 - 298
  • [28] MATURITY OF PROJECT MANAGEMENT IN POLISH AND FOREIGN CONSTRUCTION COMPANIES
    Gorecki, Jaroslaw
    FOUNDATIONS OF MANAGEMENT, 2015, 7 (01) : 71 - 82
  • [29] Management and construction of Three Gorges Project
    Dai, HC
    Cao, GJ
    Su, HZ
    PROCEEDINGS OF THE CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY, VOL 1, NO 1, 2004, : 699 - 705
  • [30] Management and construction of the Three Gorges Project
    Dai, Huichao
    Cao, Guangjing
    Su, Huaizhi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 615 - 619