共 29 条
[1]
Zhang Z., Sharifi H., Towards theory building in agile manufacturing strategy-a taxonomical approach, IEEE Transactions on Engineering Management, 54, 2, pp. 351-370, (2007)
[2]
Uddin M.K., Soto M.C., Lastra J.L.M., An integrated approach to mixedmodel assembly line balancing and sequencing, Assembly Automation, 30, 2, pp. 164-172, (2010)
[3]
Ozturk C., Tunali S., Hnich B., Ornek A., Balancing and scheduling of flexible mixed model assembly lines with parallel stations, Constraints, 67, 9-12, pp. 2577-2591, (2013)
[4]
Bautista J., Procedures for the time and space constrained assembly line balancing problem, European Journal of Operational Research, 212, 3, pp. 473-481, (2011)
[5]
Bautista J., Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules, European Journal of Operational Research, 210, 3, pp. 495-513, (2011)
[6]
Bautista J., Alfaro R., Batalla C., Modeling and solving the mixed-model sequencing problem to improve productivity, International Journal of Production Economics, 161, pp. 83-95, (2015)
[7]
Salveson M.E., The assembly line balancing problem, Journal of Industrial Engineering, 29, 10, pp. 55-101, (1955)
[8]
Jackson J.R., A computing procedure for a line balancing problem, Management Science, 2, 3, pp. 261-271, (1956)
[9]
Ali Z., Woo M., Ghafoor A., Simultaneous balancing and sequencing of mixedmodel parallel two-sided assembly lines, International Journal of Production Economics, 158, 12, pp. 314-333, (2014)
[10]
Gagnon R.J., Ghosh S., Assembly line research: historical roots. research life cycles and future directions, Omega, 19, 5, pp. 381-399, (1991)