Allocation of risks under build-operate-transfer delivery approach for transport infrastructure projects

被引:0
|
作者
Abdul-Malak, Mohamed-Asem U. [1 ]
Kaysi, Isam A. [1 ]
Schoucair, Marwan S. [1 ]
机构
[1] American University of Beirut, 850 Third Avenue, 18th Floor, New York, NY 10022, Lebanon
关键词
Contracts - Maintenance - Project management - Repair - Risk assessment;
D O I
10.3141/1761-18
中图分类号
学科分类号
摘要
The need for the build-operate-transfer (BOT) approach in the development of infrastructure projects has risen in recent years, due to budgetary and financial constraints faced by the public sector in both developing and developed countries, tightened by the necessity to repair, maintain, and modernize the existing infrastructure facilities. Risk factors that influence the parties of a prospective BOT contract during the various phases of the contract are presented. In particular, the factors pertaining to the precontract stage and to the political, construction, commercial, and financial categories of possible risks are addressed. Integrated schemes assimilating the risks involved and the corresponding alleviation measures are offered.
引用
收藏
页码:137 / 147
相关论文
共 50 条
  • [1] Allocation of risks under build-operate-transfer delivery approach for transport infrastructure projects
    Abdul-Malak, MAU
    Kaysi, IA
    Schoucair, MS
    CONSTRUCTION 2001: MATERIALS AND CONSTRUCTION, 2001, (1761): : 137 - 147
  • [2] The financial risks in build-operate-transfer projects
    Xenidis, Yiannis
    Angelides, Demos
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (04) : 431 - 441
  • [3] Build-operate-transfer in infrastructure projects in the United States
    Algarni, Ayed Muhammad
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (10) : 728 - 735
  • [4] Risks and mitigation measures in build-operate-transfer projects
    Bokharey, Syed Kamarul Bakri Syed Ahmad
    Vallyutham, Kalaikumar
    Potty, Narayanan Sambu
    Bakar, Nabilah Abu
    World Academy of Science, Engineering and Technology, 2010, 4 (03): : 81 - 87
  • [5] A Stochastic Concession Model for Infrastructure Projects Under Build-Operate-Transfer Schemes
    朱莹华
    徐峰
    胡昊
    JournalofShanghaiJiaotongUniversity(Science), 2016, 21 (03) : 320 - 327
  • [6] A stochastic concession model for infrastructure projects under build-operate-transfer schemes
    Zhu Y.
    Xu F.
    Hu H.
    Journal of Shanghai Jiaotong University (Science), 2016, 21 (3) : 320 - 327
  • [7] Risk management for build-operate-transfer infrastructure projects in China
    Liang, Wen
    Sixth Wuhan International Conference on E-Business, Vols 1-4: MANAGEMENT CHALLENGES IN A GLOBAL WORLD, 2007, : 2646 - 2651
  • [8] Excess Revenue Allocation for Build-Operate-Transfer Highway Projects
    Song, Jinbo
    Jin, Lulu
    Dong, Wanli
    JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 2016, 50 : 304 - 324
  • [9] Financing strategies for build-operate-transfer projects
    Schaufelberger, JE
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 808 - 818
  • [10] Innovative operating strategies in build-operate-transfer transport infrastructure in Nigeria
    Sanni, Gabriel A.
    Adebiyi, John O.
    INFRASTRUCTURE ASSET MANAGEMENT, 2019, 6 (03) : 155 - 165