Adverse conditions are often encountered during managed-pressure drilling (MPD). These conditions can include wellbore instability, kicks, and losses that create challenging scenarios for cementing operations, such as a narrow operational window between the pore pressure and the fracture pressure, which can compromise the necessary barrier and require unconventional solutions in deep water. This paper reviews a successful managed-pressure-cementing (MPC) operation and presents findings and lessons learned. © 2018 Society of Petroleum Engineers. All rights reserved.